A Groundwork company - serving North Miami Beach, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Aventura, FL

ADU Site Prep & Utilities in Aventura - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Miami Beach
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Aventura: What the Ground Work Actually Involves

ADU Site Prep & Utilities in Aventura runs $45,000 – $130,000, and that figure covers the unglamorous half of the project: clearing and grading the build pad, running water, sewer and electrical service to the new structure, and getting every trench inspected before a single wall goes up. Expect four to eight weeks from first excavator pass to final utility sign-off, though a tight lot west of Biscayne Boulevard can stretch that. Call (844) 797-4868 and we’ll walk the property and put real numbers on paper.

Call (844) 797-4868

How we run site prep and utility work, stage by stage

A remodeled family room with new windows and a window seat

Site prep for an accessory unit isn’t a single task, it’s a chain. Each link depends on the one before it, and skipping a step is how a foundation ends up in the wrong place or a sewer line fails inspection. Here’s the order we follow.

Stage 1: Site walk, survey and utility locate (days 1 – 3)

We start by marking the build envelope and calling in the utility locate so nobody puts a shovel through a gas line. On Aventura lots, this is also where we confirm setbacks and easement lines, since many properties near the Intracoastal carry drainage or utility easements that restrict where a structure can sit. You’ll decide the final footprint location at this stage, because everything downstream keys off it.

Stage 2: Clearing, demolition and grading (days 3 – 8)

Anything in the way comes out: old slabs, sheds, fencing, overgrown root systems. Then we grade the pad to drain away from the new structure and toward the street or a retention area. South Florida’s flat terrain and heavy summer rain mean a pad that’s off by even a few inches will pond. You’ll sign off on the grading plan before we cut.

Stage 3: Trenching and utility runs (days 8 – 18)

This is the core of the job. We trench for water supply, sanitary sewer (or a septic tie-in where city sewer isn’t reachable), electrical conduit, and low-voltage conduit for data and future smart-home wiring. Depths and slopes are dictated by code, and each run gets inspected before backfill. If you want a gas line to the unit, that happens here too. It’s also where a decision gets locked in: where the electrical panel and meter go, since that location needs utility company approval.

Stage 4: Inspections and backfill (days 18 – 28)

Open trenches get inspected first. Once the inspector signs off, we backfill in lifts and compact properly, because poorly compacted soil under a future slab leads to settlement cracks. This is the stage that most often adds calendar time, since inspection scheduling isn’t ours to control.

Stage 5: Final connections and handoff to construction (days 28 – 56)

Water, sewer, and electrical get tied to the main service, meters get set, and we hand a clean, buildable pad to whoever builds the structure. If we’re carrying the project through, this is where the Home Additions & ADU in Aventura build phase picks up and the walls start going up.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between

Most of the cost swing on this job comes from a handful of decisions you make early. Here’s what actually matters.

  • Sewer tie-in vs. an on-site system. A gravity tie to city sewer is simplest and cheapest when the main is reachable. Where it isn’t, a lift pump or an alternative system adds real money and maintenance.
  • Electrical service: subpanel vs. new meter. Tapping a subpanel off the main house is usually the economical route; a dedicated meter means the utility company treats the ADU as separate service, which suits rental units but costs more upfront.
  • Conduit for data, sound and control. Burying low-voltage conduit during the same trench dig costs little now and a fortune later. If you want smart-home integration, do it at this stage.
  • Pad construction: monolithic slab vs. stem wall. A slab-on-grade pad is standard and cost-effective on stable ground. Stem-wall foundations make more sense on sites with fill or drainage trouble.
  • Grading and drainage extras. French drains, retention, or swales cost more but solve ponding on flat Aventura lots before it becomes a problem.

Roofing and finish selections come after this phase, and if your site ties into a broader build, our Home Additions & ADU service covers that scope from foundation to finish line.

What ADU Site Prep & Utilities costs in Aventura, FL

A framer checking new wall framing on a home addition

For a typical detached unit’s site prep and utility runs, expect $45,000 – $130,000. Within that spread, here’s roughly how a written quote breaks down:

  • Site clearing, demolition and grading: $6,000 – $18,000
  • Water and sewer trenching and connections: $10,000 – $30,000
  • Electrical service and conduit runs: $8,000 – $28,000
  • Foundation pad and drainage: $15,000 – $45,000
  • Inspection fees, utility company charges and unforeseen work: $6,000 – $9,000

Five things push a job toward the high end: distance to the sewer main and the slope of the run; how much existing hardscape or structure has to come out; whether you need a new meter versus a subpanel tap; the size and complexity of the pad and drainage design; and permit scope, since a larger footprint with more utility runs triggers more inspections. What’s included in our written estimate is the labor, materials, permits we pull, and inspection coordination. What we can’t include is the unknown underground condition a probe didn’t reveal, and we’ll tell you plainly when that’s a risk. No-hassle upfront pricing means the number you see is the number you pay, barring a documented surprise.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Aventura homes specifically do to this job

Aventura is overwhelmingly vertical. Mid- and high-rise condos built from the 1970s through the early 2000s line Biscayne Boulevard and the Intracoastal, with newer luxury towers mixed in and only a limited stock of single-family homes west of Biscayne near the Aventura/Hallandale line. That matters for site prep because most single-family ADU work here happens on those western lots, and every one of them is subject to Miami-Dade permitting and inspection as well as Aventura’s own review. On the condo side, trades work under association rules, COI requirements, and Florida’s structural-integrity inspection mandates on aging towers; that’s a different job, and we keep it separate. If your property sits near a tower or an association-managed community, expect board approval and a certificate of insurance before any crew or equipment enters. Homeowners often pair utility trenching with Concrete Driveways & Concrete Work in Aventura, since a torn-up yard and a new pad are good reasons to redo the drive at the same time, and some go further with Paver Driveways in Aventura to match the new unit’s entry. We cover the whole Aventura area, ZIP 33180.

Serving Aventura, FL – Our Local Coverage Area

We serve Aventura and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Site Prep & Utilities in Aventura

New painted shaker cabinets with an organized deep drawer

Get a Free Estimate for ADU Site Prep & Utilities in Aventura

Site prep and utilities set the whole project’s success, so it’s worth getting the number right before you dig. Call (844) 797-4868 and a live person answers, any hour. We’ll schedule a free on-site estimate, walk the property, and hand you a written, line-item quote with upfront pricing and our 730-Day Done Right Promise behind it. Financing is available at 0% for 18 months, and projects over $10,000 take $1,000 off.

Written by the team at Groundwork Construction Co.

Why Aventura Chooses Groundwork Construction Co. of North Miami Beach

We set the standard for ADU site prep & utilities in Aventura.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Aventura

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Aventura Customers Say

Trusted by homeowners across Aventura and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fence

More services in Aventura

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Miami Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Miami Beach team

A local vetted partner works across North Miami Beach and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Aventura?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Aventura.

(844) 797-4868

Request a Free Estimate in Aventura

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch