A Groundwork company - serving North Miami Beach, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Miami Gardens, FL

Garage Conversion ADU in Miami Gardens - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Miami Beach
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Miami Gardens: What It Runs and What’s Realistic

A garage conversion ADU in Miami Gardens typically runs $35,400 – $94,400 for the conversion itself, and a full turnkey job with kitchen, bath and separate utility metering lands in the $53,100 – $153,400 range. Most conversions take 3 to 5 months from permit to final inspection. Call (844) 797-4868 for a free on-site estimate and a written, line-item scope before any work begins.

Call (844) 797-4868

How a Garage Conversion ADU Comes Together, Stage by Stage

A single-story rear room addition with tall windows and a new patio

What follows is the real sequence for a garage conversion in this market, with the decisions you’ll make and roughly how long each phase eats up. The build starts before day one: on the estimate walkthrough we photograph the slab, check whether the existing garage floor is level enough to float a finish over, measure ceiling height (8 feet is the floor for livable space here), and confirm where the electrical panel sits relative to the conversion.

Stage 1: Permits and design (4 – 8 weeks). This is the longest wait and the one that trips up homeowners who expect a quick start. A garage conversion is a change of use, so you’ll file with Miami-Dade County for a building permit covering the conversion, the electrical, plumbing and mechanical scopes, plus wind-load detailing. During this stretch you decide the layout: where the kitchenette lives, whether the bathroom is a half or a full, and whether you want a separate entrance. If the ADU will be rented for more than 30 days at a time, mention that up front so we document the living area and egress correctly.

Stage 2: Demo and slab prep (3 – 5 days). The existing garage door comes off, any carport tie-in or block wall that isn’t staying gets removed, and the slab gets ground and leveled. This is where we find out whether the floor needs a self-leveling pour. In most of the homes we work in, it does, since garage slabs were poured for trucks, not tile. A Sakrete patch-and-level product handles the shallow spots; deeper dips get a full topping.

Stage 3: Rough-in (2 – 3 weeks). Framing for interior partitions, electrical, plumbing and HVAC happen here, and this is where the two big cost variables show up. If the garage slab is post-tension, cutting for a new drain line is off the table without engineering, and we may route the bathroom plumbing overhead instead. If the electrical panel is a legacy 100-amp unit already carrying window AC and a dryer, it may need to be upgraded. Both of these are things you’ll see priced as line items before work starts, not surprises mid-build.

Stage 4: Insulation, drywall and finishes (3 – 5 weeks). Spray foam or batt insulation, drywall, tape and texture, flooring, trim and paint. You’ll pick flooring here, and the choice matters more in Miami Gardens than in a lot of places because humidity and slab moisture will punish the wrong pick.

Stage 5: Inspections and final (1 – 3 weeks depending on county scheduling). Rough-in inspections, then final. We schedule inspections and pull permits as part of the scope, and you receive the passed inspection record at closeout. Final walkthrough is where the punch list gets written, and the work sits behind the 730-Day Done Right Promise afterward.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Garage Conversion ADU

  • Flooring underfoot. Porcelain tile is the default for a reason: it handles slab moisture, wipes clean, and runs $6 – $14/sq ft installed. Luxury vinyl plank looks warmer and installs in a day, but in a converted garage it needs a vapor barrier or it will cup. Polished concrete is the cheapest per square foot and looks industrial; it’s not for everyone, but it’s durable and easy to cool.
  • Ceiling and AC. A ductless mini-split is how most of these ADUs get cooled, since tying into the house system often overloads it. Mini-splits run $3,500 – $7,000 installed for one or two zones. If the main house HVAC is oversized enough, a ducted tie-in is possible but more permitting.
  • Kitchenette vs. full kitchen. A kitchenette with a sink, undercounter fridge, microwave and two-burner cooktop uses less space and drops the plumbing scope. A full kitchen with a range and dishwasher adds utility load and venting. Most Miami Gardens conversions land in the middle: sink, cooktop, no dishwasher.
  • Bathroom. Half bath (toilet and sink) is the cheapest at roughly $5,900 – $14,160; a full bath with shower moves into the $10,600 – $33,000 range depending on tile and fixture grade. Tub-to-shower conversion is a common pick because it fits tighter footprints.
  • Windows and exterior door. If the garage opening gets framed in for a wall, you’re adding windows and an entry door. In this market they need product approval for the High-Velocity Hurricane Zone, so expect impact-rated openings rather than standard. That adds cost, but the wall behind them doesn’t need retrofitting later.
  • Water heating. Tankless is compact and frees closet space; a 40-gallon tank is cheaper to buy and install. Both work, tankless costs more upfront.

What Garage Conversion ADU Costs in Miami Gardens, FL

A framer checking new wall framing on a home addition

Plan on $35,400 – $94,400 for the conversion of an existing garage. A separate kitchen, bath and utility line pushes into the larger range. The lead range for these jobs is $53,100 – $153,400 once you’re building a turnkey rental or family suite.

Item Typical Range
Core conversion (framing, insulation, drywall, flooring, paint) $35,400 – $65,000
Bathroom addition $10,620 – $33,040
Half bath $5,900 – $14,160
Kitchenette $10,620 – $23,600
Mini-split HVAC $3,500 – $7,000
Electrical panel upgrade if needed $3,000 – $6,500
Impact windows and entry door $5,310 – $17,700

What moves the number up or down: (1) existing garage condition, especially whether the slab needs leveling and whether the walls are block or wood-frame; (2) whether plumbing has to be run overhead because of a post-tension slab; (3) whether the electrical panel can carry a new AC and kitchen load; (4) material grade, which is where the biggest swing lives, since tile at $6/sq ft and porcelain at $14/sq ft look the same in a bid sheet; (5) whether you want separate metering, which is a utility and permitting scope of its own. A written line-item estimate from us lists each of these as the number you see is the number you pay. What’s typically excluded: furniture, appliances beyond what we specify in the line items, and any structural repair revealed after demo.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Miami Gardens Homes Specifically Do to This Job

Miami Gardens is a built-out postwar suburb, and most of its housing went up from the late 1950s through the 1980s. That means the garages we convert here are mostly original: single-story concrete block with stucco, low-pitch or flat roof tie-ins, carports converted at some point or still open, and slabs poured well before anyone thought about an ADU. Near Hard Rock Stadium and along the Palmetto and Opa-locka industrial edges, we see a lot of block-and-stucco homes where the stucco over masonry has aged and any alteration pulls in a fair bit of detailing. The county’s High-Velocity Hurricane Zone rules govern the openings and fasteners we use, so a framed-in garage door wall needs product approval for its windows and door, not a stock window from a big-box shelf.

The flat and low-slope roofs common in the older subdivisions mean ponding and aging roof-ceiling assemblies are a real thing to plan around. A mini-split needs proper flashing at the wall penetration, and any tie-in roof work has to detail the transition correctly or you’re buying mold. We schedule exterior work around afternoon storms, which is why the roof and wall phases get slammed early in a build cycle. If the wider project involves more than the garage, we’d point you to our Home Additions & ADU in Miami Gardens page for the broader scope. We cover conversions throughout Miami Gardens, including Opa-locka, Golden Glades and Westview adjacent properties. If the driveway and garage apron are in rough shape from the old car traffic, homeowners often pair this with Concrete Driveways & Concrete Work in Miami Gardens to clean up the approach, or with Asphalt Driveways & Resurfacing in Miami Gardens on the older homes that still have asphalt aprons.

Serving Miami Gardens, FL – Our Local Coverage Area

We serve Miami Gardens and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in Miami Gardens

A remodeled hall bathroom with subway tile and a floating vanity

Schedule Your Free Garage Conversion Estimate

We’ll walk your garage, measure the slab and ceiling, check the panel and plumbing stack, and hand you a written line-item estimate for a garage conversion ADU in Miami Gardens with no change orders hiding in it. Calls are answered by a live person around the clock at (844) 797-4868. The estimate and design consult are free, and we’ll tell you straight if the garage isn’t a good candidate. Our Home Additions & ADU team handles the permit work and the inspections.

Written by the team at Groundwork Construction Co.

Why Miami Gardens Chooses Groundwork Construction Co. of North Miami Beach

We set the standard for garage conversion ADU in Miami Gardens.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Miami Gardens

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Miami Gardens Customers Say

Trusted by homeowners across Miami Gardens and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelNew architectural shingles with a clean valleyNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deck

More services in Miami Gardens

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Miami Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Miami Beach team

A local vetted partner works across North Miami Beach and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Miami Gardens?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Miami Gardens.

(844) 797-4868

Request a Free Estimate in Miami Gardens

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch