New Detached ADU in Pinewood, FL: What It Costs and How Long It Takes
A new detached ADU in Pinewood, FL typically runs $45,000 – $130,000 for the lead range on this page, and a realistic schedule is 6 to 10 months from the first site visit to the final inspection. Detached means a separate structure with its own footing, its own roof, and its own utility runs, so it costs more than a garage or interior conversion and less than a second-story addition. Call (844) 797-4868 to book a free on-site estimate and get a written line-item number for your lot in ZIP 33167.
How a New Detached ADU Gets Built in Pinewood, Step by Step

The sequence below is the one we actually run on detached units in Miami-Dade County. Every stage has a decision point where we need the homeowner, and the ones people underestimate are the survey and the product submittals.
Stage 1: Site Visit and Feasibility (Week 1)
We walk the lot and check the setbacks, the existing septic or sewer tie-in, and whether the side yard can take a structure without clipping the power drop. You decide the size and where it sits. On a 1950s – 60s Pinewood block lot, the rear yard is often deeper than you think but the utility easement is what cuts it down.
Stage 2: Drawings and County Permit Submittal (Weeks 2 – 6)
Plans go out, then the packet goes into Miami-Dade’s e-permit system. Because Pinewood is unincorporated, this is county jurisdiction, not a separate city hall, so plan review runs through the county’s process and product approval has to clear High Velocity Hurricane Zone rules. You pick exterior finish and roof now, because those submittals ride with the permit.
Stage 3: Site Prep, Footings, and Underground Utilities (Weeks 7 – 11)
Clearing, excavation, and forming for the slab or stem-wall foundation. Water, sewer, and electrical laterals get trenched and inspected before anything is poured over. This is the stage where a bad surprise lives: an old carport slab, a buried septic tank, or roots from a mature ficus.
Stage 4: Shell, Roof, and Openings (Weeks 12 – 20)
Block or framing goes up, then the roof structure and the impact-rated windows and doors. Wind-load and product-approval paperwork gets verified at framing and again at final. You confirm the layout of kitchen and bath rough-ins before the walls close.
Stage 5: Rough-In, Finishes, and Final Inspection (Weeks 21 – 34)
Mechanical, electrical, and plumbing rough-in, then insulation, drywall, cabinets, tile, and trim. County inspections happen at each rough-in checkpoint and at final. You walk the unit with us, punch list gets closed, and the unit is ready to occupy.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between on a Detached ADU
Two detached units at the same square footage can be $60,000 apart depending on what you pick. The choices below are the ones that actually move the number on a Pinewood build.
- Site-built block versus modular: Site-built CBS with stucco matches the surrounding Pinewood housing stock and is what most appraisers expect here. A modular or panelized unit from a maker like Boxabl or Mighty Buildings can compress the schedule by weeks, but it has to carry HVHZ product approval and your lot has to accept the delivery and crane path.
- Foundation and roof: Conventional slab or stem-wall with a low-slope roof keeps cost down; a raised floor or a hip roof with tile adds real money and matters if the unit will be visible from the street.
- Impact openings: Miami-Dade requires impact-rated windows and doors or approved shutters on new construction. Impact glazing costs more up front and simplifies insurance and inspection; shutter systems are cheaper and add a chore every hurricane season.
- Interior finish grade: Builder-grade laminate and LVT versus quartz counters and tile showers. Rent-ready versus family-ready. You decide at Stage 5, but the allowance gets locked at contract.
- Utilities and metering: A separate meter costs more to establish but makes the unit easier to rent or hand to family. A sub-panel off the main house is cheaper and ties the two structures together.
- Kitchenette size: A full kitchen costs noticeably more than a compact 24-inch range and sink combo. Most detached ADUs in Pinewood run compact.
Brand partners show up here where they earn their place: Cover for a prefab shell if you go that route, and our standard cabinet and counter partners on the interior build.
What a New Detached ADU Costs in Pinewood, FL

For a detached unit in Pinewood the working range is $45,000 – $130,000, with a typical mid-size build landing in the middle of that band. Where you land depends on five variables:
- Square footage: A compact studio sits near the low end; a full one-bedroom with a real kitchen pushes toward the top.
- Site condition: A clean rear yard is easy. An old slab to break, a buried tank, or a tight utility path adds cost and weeks.
- Utility runs: Distance from the main house to the unit drives trenching and lateral cost. A detached unit at the back of a deep lot can add several thousand dollars in underground work.
- Material grade: Impact glazing, tile roof, and quartz counters versus shutters, shingle, and laminate.
- Permit and submittal scope: A full HVHZ packet with engineer-signed plans runs more in fees and time than a simple one, but it’s not optional here.
A written estimate from us breaks out foundation, framing, roof, openings, mechanicals, finishes, permits, and inspection fees as separate lines. What’s typically outside the number: landscaping and sod replacement, a new driveway to the unit (homeowners often pair this with Concrete Driveways & Concrete Work in Pinewood), and any furniture or appliance package you buy yourself. Pricing is upfront, no surprises, and the number you see is the number you pay. If the scope grows, we tell you before we build it, not after.
See the difference
Before
After
Before
After
Before
AfterWhat Pinewood Homes Specifically Do to a Detached ADU Project
Pinewood sits in Miami-Dade’s inland northwest corridor, and that single fact shapes every detached ADU here. Because ZIP 33167 is unincorporated, there’s no separate city hall issuing your permit. Everything runs through Miami-Dade County’s e-permit system, county plan review, and private provider inspections, all of which have to satisfy the High Velocity Hurricane Zone product-approval rules that apply across the county. On top of that, most of the housing stock here is mid-century CBS with stucco exteriors and flat or low-slope roofs. When we tie a new detached unit into an older main house, the roof-to-wall connection on that original structure comes into play, and on 1950s – 60s homes those connections are often toe-nailed or minimally strapped. The county inspector may want decking off to verify the straps before the permit closes, so we plan for that on the front end rather than discovering it at final. Hurricane season from June through November is the other driver. Wind mitigation and impact-rated openings decide the roof spec and the insurance profile of the finished unit, and the May-through-October wet season means drainage around the new structure has to be designed, not improvised. If the detached unit is part of a full Home Additions & ADU in Pinewood plan, we sequence both projects under one permit strategy so the inspections don’t collide.
Serving Pinewood, FL – Our Local Coverage Area
We serve Pinewood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in Pinewood

Plan on 6 to 10 months from first site visit to final inspection, with permit review alone eating 4 to 6 weeks on a typical Miami-Dade packet. Build time runs 5 to 7 months once the permit is in hand. Weather, product-approval corrections, and inspection scheduling are the usual reasons a job slides to the long end. Call (844) 797-4868 for a schedule tied to your specific lot.
Yes. A detached ADU is new construction and requires a full Miami-Dade County building permit, plus separate electrical, plumbing, and mechanical permits. Because Pinewood is unincorporated, the county is the authority having jurisdiction, not a city office. We pull the permits and coordinate the inspections as part of the job.
Usually, yes. A truly detached unit has its own footing and doesn’t require reworking the main house structure. The utility tie-in is where the main house gets involved, since water, sewer, and power have to come off the existing service or a new meter. We scope that at the site visit so you know which it will be.
The range here is $45,000 – $130,000, and size, site condition, utility distance, finish grade, and permit scope are the five things that push a job up or down. A written line-item estimate takes the guesswork out. Call (844) 797-4868 and we’ll come out and price it on your lot.
Every detached ADU we build is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right, for two full years after completion. That’s one of the longest workmanship guarantees in residential construction. We stand behind the structure, the finishes, and the trade work in writing.
Get a Free Estimate for Your Pinewood Detached ADU
Book a free on-site estimate and we’ll walk your lot in Pinewood, check setbacks and utility paths, and hand you a written line-item number for a new detached ADU. No sales pitch on the call. We answer questions, look at the site, and put the price in writing. Our technicians are background-checked and arrive in uniform, and a live person answers the phone around the clock. Call (844) 797-4868 to schedule. You can also see the wider scope we handle on our Home Additions & ADU page, and if the unit needs a paver approach, homeowners often pair this with Paver Driveways in Pinewood. Our work covers Pinewood and the surrounding area.