







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Tub-to-Shower Conversion Costs in North Miami Beach, FL
A permitted tub-to-shower conversion in a North Miami Beach slab home typically runs $4,500-$12,000, and the number depends on three things: your tile selection, the grade of glass enclosure, and whether the drain has to move. Our standing range for this work at Groundwork Construction Co. of North Miami Beach is $4,130-$11,800, with the spread driven by those same variables. Call (844) 797-4868 for a written, upfront estimate – the number you see is the number you pay, and it’s free.
North Miami Beach is a city where the housing stock does most of the talking. The residential core is dominated by 1950s-1970s single-story concrete-block and stucco ranch homes, many still carrying original cast-iron or galvanized plumbing under the slab. That matters for this job more than it does for a kitchen refresh, because a bathroom is where plumbing, framing, and waterproofing all meet in a wet area that has to survive Miami-Dade’s heat, seasonal downpours, and a high water table sitting just below the floor. We work inside those constraints on every conversion.

The Permit Is Not the Obstacle – It’s the Protection
Here’s the part of the price that nobody likes talking about, so we’ll say it straight. If the drain moves even six inches, you need a plumbing permit. If the wall framing changes to fit a new shower footprint, you need a building permit. Both are routine when you swap a tub for a walk-in shower, and neither is optional. Miami-Dade property records are public, and buyers’ agents routinely pull permit histories before making an offer on a 1960s home. An unpermitted wet-area conversion shows up at closing as an open violation, and it becomes a negotiating chip pointed directly at the seller.
The permit fee itself usually lands somewhere between $150 and $300. The deal falling apart does not. That’s the tradeoff, and it’s why we build the permit into the written estimate from day one rather than discovering it mid-job.
If you want to see how this fits into a larger scope, our Bathroom Remodeling in North Miami Beach page walks through full-room projects where the conversion is one component of a bigger change.
What the Real Cost Breakdown Looks Like
Vague bids are the single biggest source of anger in this trade. A “tub to shower” quote that says $5,000 and then generates change orders for concrete cutting, permit fees, and debris disposal is not a $5,000 job – it’s an $8,000 job you were lied to about. Our pricing lists every line item up front, and here are the ranges we hold to in North Miami Beach:
| Line Item | Typical Range |
|---|---|
| Tub-to-Shower Conversion (full scope) | $4,130-$11,800 |
| Walk-In Shower Installation | $5,310-$14,160 |
| Shower Replacement (shower-to-shower) | $3,540-$10,030 |
| Small Bathroom Remodel | $5,900-$14,160 |
| Full Bathroom Remodel | $10,620-$33,040 |
| Bathroom Vanity Installation | $945-$3,540 |
Notice the walk-in shower line runs higher than a straight conversion in some cases. That’s not a mistake. A walk-in shower done to code requires a full continuous waterproofing membrane across the entire wet area, and framing changes that open up the stall usually come with it. We’ll unpack that below.

Trading a Leaky Old Tub Surround for a Properly Sealed Shower
Most homeowners don’t realize what they’re actually getting rid of. A tub surround is typically a three-sided alcove with minimal waterproofing – one wall of tile board, a lip, and a lot of hope. It survives because the tub itself catches the water. Remove the tub and that same three-wall setup becomes a shower that leaks directly into the framing and the slab below.
A code-compliant conversion replaces that with a full continuous membrane over the entire wet area, sealed at the drain, the curb, the corners, and every penetration. You’re not paying for tile. You’re paying for the layer underneath the tile that keeps your floor and framing dry for the next twenty years.
What we see on the ground in North Miami Beach specifically: many homes west of Biscayne Boulevard sit on shallow footings just above the water table, and a leaking shower pan there isn’t just a slow drip into the yard. The moisture has nowhere to go, so it wicks up into the slab and the base of the wall. We’ve opened up more than one “small tile job” that turned into reframing once the membrane failure was visible.
What to Look For in a Tub-to-Shower Quote
Before you sign, run the bid through these checks. A quote that fails two or more of them is not a quote worth comparing on price alone.
- Permit line item, spelled out. If the estimate doesn’t name the permit and its fee, ask why. It’s a line item, not a favor.
- Drain relocation cost, in writing. “We’ll see once we get in there” is how change orders are born. The quote should state whether relocation is included or priced separately.
- Waterproofing method named. Liquid membrane, sheet membrane, or foam board system – the product should be on the page, not the word “waterproof.”
- Debris disposal in the price. Concrete and old tub removal isn’t free, so it shouldn’t show up as a surprise at the end.
- A real workmanship guarantee. Ours is the 730-Day Done Right Promise – if it’s not done right, we make it right, in writing, for two years.
- Glass enclosure grade specified. Framed vs. frameless, 3/8″ vs. 1/2″ glass – the difference is $1,500 or more, and it belongs in the bid.
Why the Written Estimate Matters More Than the Sales Pitch
Concrete cutting, permit fees, and debris disposal are the three line items that quietly inflate a tub-to-shower job after the contract is signed. We put them in the estimate on day one, before you commit. That’s what upfront pricing means at Groundwork – no surprises, no mid-job phone call asking for more.
Every project runs on background-checked, uniformed technicians who arrive ready to work, not in an unmarked van with no name on it. Our technicians bring up to 12 years of hands-on experience to the wet areas where it counts. And when you call, you reach a live person, 24/7 – not a voicemail that waits until Monday. Larger conversions over $10,000 also qualify for $1,000 off, plus 0% financing for 18 months to spread the cost without interest. If you’re weighing the conversion against a full-room project, our Bathroom Remodeling team handles the whole scope from foundation to finish line.
Frequently Asked Questions
A permitted tub-to-shower conversion in North Miami Beach typically costs $4,130-$11,800, with a realistic all-in range of $4,500-$12,000 once tile upgrades and glass enclosure grade are factored in. The low end covers a standard tile selection and a framed enclosure with no drain relocation. Call (844) 797-4868 for an exact quote – the estimate and design consult are free.
Yes, you almost always do. Moving the drain by even six inches triggers a plumbing permit, and altering the wall framing for a new shower footprint triggers a building permit – both are routine in this work. The fee runs $150-$300, and skipping it can expose you to an open violation at resale. Call us and we’ll walk you through what your specific job requires.
It can, and often does. Miami-Dade property records are public, and buyers’ agents routinely pull permit histories on 1960s North Miami Beach homes before making an offer. An unpermitted wet-area conversion becomes a negotiating chip against you, and can stall a closing or force a price reduction larger than the permit ever would have cost. Let’s get it permitted right the first time – call (844) 797-4868.
For a failing surround on a 1960s slab home, replacing it with a properly sealed walk-in shower usually costs less over ten years than repeated repairs to a system that was never designed to be a shower. A straight shower replacement runs $3,540-$10,030; a full conversion with new waterproofing runs $4,130-$11,800, and the membrane is what protects the floor. Call for a free estimate and we’ll tell you which one your situation actually calls for.
Ready to Get a Real Number?
Book a free project estimate and design consult with Groundwork Construction Co. of North Miami Beach, and you’ll get a written, line-item price with the permit, concrete cutting, and debris disposal already in it. Call (844) 797-4868 – a live person answers any hour, any day. Built to last, backed in writing for 730 days.
Written by the team at Groundwork Construction Co. of North Miami Beach, serving North Miami Beach, FL.
What Our Customers Say
"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett












