







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does ADU Construction Cost in North Miami Beach?
ADU construction in North Miami Beach typically costs $106,200 to $259,600 for a complete, permitted accessory dwelling unit, depending on size, whether you build new or convert existing space, and how the unit connects to power, water, and sewer. A detached one-bedroom unit in the 600 to 750 square foot range usually lands near the lower end, while a two-bedroom, two-bath unit with a full kitchen and separate utility meter pushes toward the top. Most projects we scope in North Miami Beach fall between $145,000 and $210,000 once site work and impact-rated construction are counted.
That’s the number, upfront, before anyone walks your property. We put it on paper because vague bids are how homeowners get burned. Every ADU we build comes with our 730-Day Done Right Promise: if it’s not done right, we make it right, in writing.
Key Takeaways
- A full ADU in North Miami Beach runs $106,200 to $259,600 in 2026.
- Garage conversions are the budget play at $35,400 to $94,400.
- Miami-Dade impact-rated windows, doors, and roof tie-downs add real money but aren’t optional.
- Permits, impact fees, and utility work can add 8% – 15% on top of hard construction cost.
- Free estimates, 0% financing for 18 months, and $1,000 off projects over $10,000 are available now.
If you want the full picture of what we handle across this city, start with our North Miami Beach service area page, or go straight to our home page to see every service line we run.

ADU Construction Cost Breakdown (2026)
Here’s how the money breaks down on a real North Miami Beach ADU. These ranges reflect 2026 pricing for this market, not a national average pulled off a blog.
| Line Item | Typical Cost Range |
|---|---|
| Detached ADU, full build (foundation to finish) | $106,200 – $259,600 |
| Garage conversion to ADU | $35,400 – $94,400 |
| Home addition (attached in-law suite or extension) | $53,100 – $153,400 |
| Impact windows and doors (unit package) | $9,440 – $29,500 |
| Full roof for the ADU | $9,440 – $23,600 |
Now the smaller trades that add up fast inside a unit. A compact kitchen inside an ADU lands around $10,620 to $23,600. A full bath runs $5,900 to $14,160 for the smaller footprint typical of an ADU. Cabinets alone are $4,720 to $15,340, and a walk-in shower comes in at $5,310 to $14,160. Stack those three together and you’re looking at $25,000 to $50,000 of the total just for the wet rooms and kitchen.
The shell is the other big bucket. Foundation, framing, stucco, and roof together usually eat 45% to 60% of a detached build. If your ADU sits on a slab in a low-lying pocket of North Miami Beach, you’ll also pay for elevated finished floor height, which is standard practice here and adds to the concrete line.
What pushes cost up? Square footage is the obvious one, but so is distance from the main house. A detached unit 60 feet from the main panel costs more to power than a garage conversion attached to the same wall. Impact glazing, a second meter or subpanel, and a full second kitchen each add thousands. What brings it down? An existing slab, an existing roofline you can extend, and a garage you’re already paying taxes on.
What Affects ADU Construction Pricing in North Miami Beach
North Miami Beach isn’t Homestead and it isn’t Miami Beach. The building stock, the water table, the codes, and the lot sizes all shape what an ADU costs here. Six things move the number most.
- Wind-borne debris requirements. Miami-Dade County enforces the High-Velocity Hurricane Zone code. Every window, door, and garage door on your ADU needs impact-rated glazing or an approved shutter system. That’s not a line item you can shave; it’s built into the price from day one. Impact window packages on an ADU run $9,440 to $29,500.
- Flood zone and finished floor elevation. Large parts of North Miami Beach sit in AE flood zones near the Intracoastal and the canal system. Base flood elevation requirements can push your slab up two or three feet, which means more fill, more concrete, and a taller stem wall. Budget a few thousand extra if your lot backs up to a canal.
- Lot size and setback rules. Many North Miami Beach lots in neighborhoods like Eastern Shores, Sky Lake, and the streets off NE 163rd are already built close to their setbacks. A detached ADU needs to clear rear and side setbacks and stay under lot coverage limits. If your lot is tight, an attached addition or garage conversion is often the only path, and that changes the cost entirely.
- Utility runs. A detached ADU needs its own electrical feed, water line, and sewer or septic connection. Trenching across an existing yard, cutting through a driveway, or adding a second meter adds cost. Garage conversions are cheaper here because the utilities are already within a few feet.
- Existing structure condition. If you’re converting a garage, we open the walls and check for termite damage, old wiring, and whether the slab can carry the load. North Miami Beach garages built before the 1994 code updates often need roof tie-downs brought up to current standards before they can become a legal dwelling.
- Permit and impact fees. Miami-Dade and the City of North Miami Beach charge plan review, building permit, and utility connection fees. On a full ADU, permits and fees typically land in the 8% – 15% range on top of construction. We handle the permitting paperwork as part of the project, and the estimate you get reflects the real number, not a placeholder.
One local pattern worth calling out: North Miami Beach has a lot of older single-story homes on generous lots, and a lot of them have garages that were never finished inside. In Sky Lake and the neighborhoods near Greynolds Park, we regularly see garages with a single 20-amp circuit and no insulation. Turning that into a legal ADU means new electrical service, insulation, drywall, and a bathroom rough-in, which is why conversion budgets in this city come in higher than the national “just add a kitchenette” version of the same project. The bones are there. The systems aren’t.

Detached ADU vs. Garage Conversion vs. Attached Addition
The three build types carry very different price tags, and picking the right one for your lot is the single biggest cost decision you’ll make.
A detached ADU is the most expensive option at $106,200 to $259,600. It’s also the most flexible: separate entrance, separate utilities, private outdoor space, and the best rental separation. If you have the lot depth, this is the build that adds the most long-term value.
A garage conversion runs $35,400 to $94,400 and reuses the existing shell, foundation, and roofline. It’s the fastest path and the friendliest to a tight budget. The catch is that you lose the garage, and in a city where street parking fills up fast, that matters. We check the slab, roof structure, and tie-downs before quoting, because a conversion on a sound garage is a great deal and a conversion on a failing one is a money pit.
An attached addition in the $53,100 to $153,400 range is the middle path. It shares a wall with the main house, which saves on exterior walls and roofing, and it works on lots where a detached unit won’t fit. It’s also the right call when you’re building an in-law suite you want connected to the main home rather than a rental unit.
If you’re weighing an ADU against other big-ticket projects, it helps to compare against our home additions and ADU work and a full kitchen remodeling build. The kitchen numbers are smaller, but the ADU adds a whole living unit.
For homeowners considering the garage route, our garage conversion service walks through exactly what gets changed and what stays.
How to Save on ADU Construction
We’re not going to pretend an ADU is cheap. But there are real ways to shave cost without cutting corners on code compliance or hurricane protection.
- Reuse an existing structure. A garage conversion saves the foundation and roof. That alone can knock $50,000 to $100,000 off a full detached build.
- Keep it compact. A 600 square foot ADU is dramatically cheaper per unit than an 850 square foot one. The kitchen, bath, and utility runs scale with size.
- Put the ADU close to the main house. Shorter utility runs, less trenching, less concrete. Every foot of distance from your main panel and water line is money.
- Choose finishes for durability, not flash. Porcelain tile floors and a simple quartz countertop look clean for decades. Skip the imported stone in a rental unit.
- Bundle the work. Building the ADU alongside a bathroom remodel or roof replacement on the main house means one crew, one permit cycle, and shared mobilization costs.
- Ask about financing. 0% financing for 18 months is available, plus $1,000 off projects over $10,000. That’s real money off a project this size.
We always start with a free project estimate and design consult. No charge, no pressure, just a real number on paper so you can plan. Our technicians have up to 12 years of experience and arrive background-checked and in uniform, so the person quoting your ADU is the same caliber of professional who builds it. Upfront pricing, no surprises, and our 730-Day Done Right Promise on every project.
Planning, Permits, and Timeline
Budget and schedule go together. An ADU in North Miami Beach typically takes four to six months from signed contract to final inspection, and a good chunk of that is permitting. Plan review with the City of North Miami Beach runs several weeks, and if the lot sits in a flood zone, expect additional review time for elevation documentation.
Here’s the rough sequence: design and engineering, permit submission and review, site work and foundation, framing and hurricane tie-downs, roof, rough-in trades and inspections, insulation and drywall, finishes, final inspection, and certificate of occupancy. We build the permit timeline into the schedule from day one rather than discovering it mid-project. If you want to compare this against a shorter-scope path, our garage conversion page covers the faster route in detail.
Why the Brand Partners and Impact Products Matter
An ADU is a long-horizon structure. It will sit in a hurricane zone for decades, and what goes into it determines what it costs you in repairs later. That’s why we specify from a curated list of top-tier brands across every trade, like Andersen and Pella for impact windows and doors, GAF and CertainTeed for roofing. On the kitchen and bath side of a unit, KraftMaid cabinets and Kohler fixtures are standard for us.
None of that is about looking fancy. It’s about matching a premium material to a 730-Day Done Right Promise and knowing the manufacturer will stand behind their warranty. Built to last, backed in writing. If a product fails, we’re not stuck chasing a fly-by-night supplier; we’re dealing with brands that answer their phones.
Windows and doors in particular are where homeowners get talked into cheap glazing that fails code. Our windows and doors service uses only Miami-Dade approved impact assemblies. A cheaper window that fails inspection costs you far more than the upgrade.
How Live Project Support Fits In
ADU projects run months, and questions come up at odd hours. That’s why our calls are answered by a live person 24/7, every day of the week. No voicemail, no waiting until Monday. If you’re signing permit documents on a Saturday morning or standing in a half-finished unit with a question, a real human picks up.
We move from foundation to finish line with one contractor rather than a handful of subs you have to chase. Project updates, change-order conversations, and questions all go through the same team. For homeowners with a larger multi-scope project, our North Miami Beach service area page covers the full range of what we handle, and our home page shows how the seven service lines fit together.
FAQs – ADU Construction Cost
How much does it cost to build an ADU in North Miami Beach?
A full ADU in North Miami Beach costs between $106,200 and $259,600, depending on size and whether it’s detached, attached, or a garage conversion. Garage conversions run $35,400 to $94,400. Call (844) 797-4868 for a free estimate set to your exact lot.
Is it cheaper to convert a garage or build a detached ADU?
A garage conversion is significantly cheaper, at $35,400 to $94,400 versus $106,200 to $259,600 for a detached build. You save the cost of a new foundation and roof but lose a parking space. Call (844) 797-4868 and we’ll tell you which path makes sense for your property.
Do I need special permits for an ADU in North Miami Beach?
Yes. Every ADU requires a building permit from the City of North Miami Beach, and Florida law now allows single-family homeowners to build at least one attached or detached ADU on their lot. Budget roughly 8% – 15% of construction cost for permits and fees. Call (844) 797-4868 and we’ll walk you through the permit path for your address.
Are impact windows required on an ADU in North Miami Beach?
Yes. Miami-Dade County’s High-Velocity Hurricane Zone code requires impact-rated glazing or approved shutter systems on all openings, and an ADU package runs $9,440 to $29,500 depending on size. This is not an upgrade you can skip. Call (844) 797-4868 for an exact window and door quote.
Can I finance an ADU build?
Yes. We offer 0% financing for 18 months and $1,000 off projects over $10,000, which makes a build this size more manageable. Free project estimate and design consult included. Call (844) 797-4868 to talk through the numbers with a live person any hour of the day.
An ADU is one of the largest projects a homeowner will ever take on, and the difference between a good experience and a bad one is trust you can verify. Groundwork Construction Co. of North Miami Beach builds with upfront pricing, no surprises, background-checked uniformed technicians, and a 730-Day Done Right Promise that goes far beyond what most contractors offer. Our technicians have up to 12 years of experience, and calls are answered by a live person 24/7. When you’re ready for a real number on paper, reach out and we’ll put one together.
Call (844) 797-4868 for a free ADU estimate in North Miami Beach. Estimates are free, the price is set upfront, and if it’s not done right, we make it right.
Pricing reflects the North Miami Beach market as of 2026. Groundwork Construction Co. of North Miami Beach offers free estimates – call (844) 797-4868.
What Our Customers Say
"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett












