ADU Site Prep & Utilities in Ojus, FL: What the Ground Work Actually Costs
ADU site prep and utilities in Ojus, FL runs $45,000 to $130,000, covering everything from clearing and grading the pad to trenching water, sewer, and electrical service out to the structure. Most Ojus jobs take 6 to 12 weeks from first excavation to final utility inspection, longer if you’re tying into an older 1950s-era sewer lateral along the Ives Dairy corridor. Call (844) 797-4868 and we’ll walk your lot and give you a written, line-item number.
How We Run Site Prep & Utilities, Stage by Stage

Site work is the part of an ADU project that decides whether the rest goes smoothly or fights you for months. Here’s the real sequence we follow in Ojus, with the decisions that land on you at each step.
Stage 1: Lot survey and utility locate (days 1-3)
Before a shovel hits dirt, we pull the survey and call in the utility locates. In Ojus this matters more than usual because you’re working in an unincorporated pocket of ZIP 33179 where water and sewer service can come from different providers block to block. We confirm exactly where your water meter, sewer lateral, and existing electrical service enter the property. You decide: whether you want the ADU metered separately (higher upfront cost, cleaner billing later) or sub-metered off the main house.
Stage 2: Clearing, grading, and pad prep (days 3-10)
We strip vegetation, cut and fill to grade, and compact the pad to the elevation the foundation plan calls for. South Florida’s high water table means we’re often building up rather than digging down. We verify drainage slopes away from both the ADU pad and the existing house. You decide: whether to add a swale or French drain now while the ground is open – far cheaper than retrofitting after the structure is up.
Stage 3: Utility trenching and rough-in (days 10-25)
This is the heart of the job. We trench for water supply, sewer or septic connection, electrical conduit, and any gas line. Depths and materials follow the local code the jurisdiction has adopted – more on the Ojus jurisdiction split below. We schedule the rough-in inspection before backfilling, because a failed inspection with trenches closed means re-excavating. You decide: conduit sizing for future needs (EV charging, a future second unit) – it’s cheap now and expensive to add later.
Stage 4: Inspections and backfill (days 25-40)
Underground plumbing and electrical each get their own inspection before the trenches close. We don’t backfill until every rough-in has a signed-off sticker. Then we compact in lifts and restore the surface. You decide: whether the restored surface is sod, gravel, or tied into new concrete or pavers.
Stage 5: Final connections and tie-ins (days 40-80)
Once the structure is up, we make the final utility connections, set the meter, and coordinate the final inspection. This is where a separate-meter job takes longest because it depends on the utility company’s schedule, not ours.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Site Prep Choices You’ll Actually Make
Most of the cost swing on a site prep and utilities job comes down to a handful of decisions. Here’s the honest trade-off on each.
- Foundation type: A monolithic slab is the standard, most economical choice on Ojus’s sandy, high-water-table lots and handles the heat-driven soil movement well. A stem-wall or raised foundation costs more but keeps the floor above grade in a low spot. For modular units from builders like Boxabl or Mighty Buildings, the manufacturer’s foundation spec dictates what you can use.
- Utility routing: Direct-bury cable is cheapest but short-lived in wet soil. PVC conduit costs more upfront and lasts decades – worth it in South Florida’s saturated ground.
- Separate meter vs. sub-meter: A separate meter adds cost and a utility coordination step but makes an ADU genuinely independent. Sub-metering is cheaper and easier but keeps you tied to the main service.
- Sewer vs. septic: If a sewer lateral is available, connection is straightforward. On lots where it isn’t, a new septic system adds significant cost and a separate approval process.
- Drainage: A finished swale or French drain adds a few thousand dollars but prevents the ponding that plagues flat South Florida lots after an afternoon storm. Skipping it is the most common regret we see.
What ADU Site Prep & Utilities Costs in Ojus, FL

Site prep and utilities for an ADU in Ojus typically lands between $45,000 and $130,000. That’s the working number, and here’s what pushes a job toward the low or high end:
- Lot size and access: A tight lot off Biscayne Blvd where equipment can’t reach the back yard adds handling time and cost.
- Existing utility condition: Tying a new ADU into a 1950s sewer lateral that needs replacement drives cost up fast.
- Trench depth and length: The farther the ADU sits from the utility entry point, the more trenching, materials, and inspection work.
- Metering and service upgrades: A separate meter or a panel upgrade to carry the added load adds real money.
- Permit scope: Which jurisdiction approves the work and how many inspections it requires changes both the fee and the timeline.
A written estimate from us itemizes excavation, trenching, materials, inspection coordination, and surface restoration as separate lines, with the number you see being the number you pay. Call (844) 797-4868 for an exact quote – estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Ojus Lots Specifically Do to This Job
Ojus straddles the Miami-Dade and Broward county line in an unincorporated pocket, and that split shapes nearly every site prep job here. Depending on which side of the line your lot falls, the work may need Miami-Dade product approval or Broward’s equivalent, and the two county building departments don’t always agree on inspection sequencing. We confirm your jurisdiction before we pull a single permit, because a trench approved under the wrong county’s rules means tearing it back open. The housing stock compounds it: the older block-and-stucco ranches here often have shallow or aging utility lines, and the high-rise condos along the Ives Dairy corridor follow association construction rules on top of county code. Pair this with drainage work and you’re touching the same ground – homeowners often pair it with Concrete Driveways & Concrete Work in Ojus or Paver Driveways in Ojus once the trenches are backfilled.
Serving Ojus, FL – Our Local Coverage Area
We serve Ojus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – ADU Site Prep & Utilities in Ojus

Plan on 6 to 12 weeks from excavation to final utility inspection. The biggest schedule variable is inspection scheduling with whichever county building department has jurisdiction over your lot, since Ojus straddles both. Call (844) 797-4868 for a timeline specific to your property.
Yes – trenching, utility connections, and foundation work all require permits here. Which jurisdiction issues them depends on your exact location near the Miami-Dade/Broward line, and we sort that out before we start. We pull the permits and see every inspection through.
Often, yes, if the ADU ties into existing service without upgrading capacity. But an older Ojus ranch frequently needs a service upgrade to handle a second dwelling, and that means running new lines. We’ll tell you honestly which side of that line your lot falls on during the estimate.
Between $45,000 and $130,000 depending on lot access, existing utility condition, trench length, metering choice, and permit scope. Call (844) 797-4868 for a free, itemized estimate – the number you see is the number you pay.
Every site prep and utilities job falls under our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space. Call (844) 797-4868 with questions about coverage.
This work is a piece of the bigger picture, so it’s worth understanding how it fits into a full Home Additions & ADU in Ojus project, and you can explore our full Home Additions & ADU service for the wider scope. We handle ADU site prep and utilities throughout Ojus and the surrounding area.
Get a Free Site Prep Estimate in Ojus
Site prep and utilities is the stage that decides whether your ADU project stays on budget or fights you at every inspection. Call (844) 797-4868 and a live person answers, any hour. We’ll schedule a free on-site estimate, sort out your permit jurisdiction, and hand you a written, itemized quote with the price locked in before work starts.