Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Golden Glades, FL: What the Job Actually Costs
New cabinets and countertops in Golden Glades, FL typically run $14,000 – $45,000 for a full kitchen’s worth, and the same range covers most projects here whether you’re changing the layout or matching the room you already have. A standard box-for-box swap finishes in about 3 to 5 working days once materials land; a layout change with new plumbing and electrical takes 2 to 3 weeks. Call (844) 797-4868 for a free on-site estimate and a written line-item quote before anything gets ordered.
How the Job Runs, Day One Through Punch List

Cabinet and countertop work is mostly a sequencing problem. Templates get cut in the wrong order and you lose a week waiting on stone. Here’s the order we hold to.
Stage 1: Measure, verify, and lock the layout (day 1)
We template the room, check that walls are plumb and floors are level (they rarely are in a 1960s ranch), and confirm appliance sizes against the cabinet spec. You decide door style, finish, and whether the sink and range stay where they are. That last call is the big one. Moving either means new plumbing rough-in and a permit, and it adds days.
Stage 2: Order and permit (days 2 – 14)
Cabinet lead time runs 3 to 6 weeks on most semi-custom lines, faster on stock. Stone gets templated only after cabinets are set, so we don’t slab-shop yet. If plumbing or electrical is moving, we pull the permit now and schedule the rough-in inspection. This is the longest quiet stretch, and it’s where cheap bids fall apart: the contractor who ordered before templating is the one who eats the mistake, or passes it to you.
Stage 3: Demo and prep (days 1 – 2 of install)
Old cabinets come out, and so does the old backsplash if it’s going. We cap or reroute plumbing, patch drywall, and set the floor protection. You’re without a working kitchen for roughly 5 to 8 days total on a typical job; plan on a microwave and a cooler. If walls need furring to square up a 1950s block kitchen, that happens here.
Stage 4: Cabinet set and countertop template (days 3 – 4)
Bases go in first, leveled and shimmed, then uppers. Once bases are set and secured, the stone fabricator templates. We hand over the exact sink cutout and cooktop dimensions so the slab comes back right. Fabrication runs 5 to 10 business days. You choose edge profile and slab layout while you wait.
Stage 5: Countertop install and finish (final 1 – 2 days)
Stone goes down, sink and faucet get set, dishwasher gets tied in, and appliance panels are fitted. Final walkthrough covers door alignment, drawer glide adjustment, and caulk lines. We don’t call it done until you’ve opened every drawer.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Every dollar in this job traces back to four decisions. Here’s the honest version of each.
- Cabinet construction: stock boxes are fast and cheap and hold up fine for a rental; semi-custom gives you the sizes to fill odd walls and runs a tier higher in price. Plywood boxes outlast particleboard in South Florida humidity, and that matters over a 15-year horizon. KraftMaid is our go-to semi-custom line; their door and finish options cover most of what Golden Glades homeowners ask for.
- Door style and finish: painted shaker is the workhorse. Thermofoil is the budget pick and can peel at the edges in humid rooms. Wood veneer looks rich and needs more care near the sink.
- Countertop material: quartz is the default for most of our Golden Glades clients. It’s non-porous, handles the humidity, and Cambria’s quartz line gives you the tightest color consistency. Granite costs a bit less per square foot on some slabs, but it’s porous and needs sealing. Laminate is the value play and honestly fine in a low-traffic kitchen.
- Layout changes: moving the sink, range, or fridge adds plumbing, electrical, and a permit. Worth it if the current flow is genuinely bad. Skip it if the room works and you’re just tired of the color.
What Cabinets & Countertops Cost in Golden Glades, FL

Expect $14,000 – $45,000 for a full cabinets and countertops project here. A box-for-box replacement of an average kitchen lands near the bottom of that range. A layout change with new plumbing, electrical, and a kitchen island lands near the top.
Here’s the line-item view, so you can see where the money goes:
- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Kitchen island installation: $3,000 – $10,000
- Backsplash installation: $800 – $2,500
Four variables push the number around: room size (linear feet of cabinet run drives everything), existing condition (out-of-square walls and old plumbing add labor), layout changes (each moved fixture adds a permit and a rough-in), material grade (semi-custom cabinets and quartz run higher than stock and laminate), and permit scope (electrical or plumbing triggers one; a straight box swap may not).
A written estimate from us includes cabinets, countertops, installation labor, demo, haul-away, and permit fees we know about. It doesn’t include appliance costs, backsplash tile if you’re supplying it, or structural repairs we can’t see until the wall opens. We list those exclusions in writing so there are no change-order surprises. The number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Golden Glades Homes Specifically Do to This Job
Most of the kitchens we open here are inside 1950s – 1970s concrete-block ranch homes, many with carports and flat or low-pitch roofs. Those blocks rarely get furred to exact tolerances, so wall cabinets need shimming and scribing that a newer subdivision never requires. Cabinets that looked square in the showroom need custom fillers at the wall and crown that meets the ceiling where the ceiling actually is. Budget an extra half-day for it and you won’t be caught off guard.
Permits matter here too. Miami-Dade County’s post-Andrew building code shapes every renovation in this part of Northeast Miami-Dade, and Golden Glades parcels sit within a FEMA flood zone. That doesn’t usually change a cabinet install, but if the scope expands to moving the kitchen or opening a wall, it does. Many low-lying lots here also carry septic-to-sewer tie-ins in progress, so we check with Miami-Dade DERM before we touch plumbing on a job that was supposed to be cabinets-only. We pull permits and coordinate inspections as part of the estimate, not as an afterthought. And because we cover all of Golden Glades and the surrounding ZIP 33162, we’re familiar with the version of these jobs the county sees every day.
Serving Golden Glades, FL – Our Local Coverage Area
We serve Golden Glades and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Golden Glades

A box-for-box swap runs 3 to 5 working days of install once materials arrive, with cabinet lead time of 3 to 6 weeks on top. A layout change adds 1 to 2 weeks for rough-in, inspection, and stone fabrication. Call (844) 797-4868 for a schedule estimate tailored to your kitchen.
A straight replacement with no plumbing or electrical changes usually needs no permit. Moving the sink, range, or fridge does, and we pull it for you and coordinate the inspection. Call (844) 797-4868 and we’ll tell you which side of that line your project falls on.
Yes, and most of ours are. Keeping the sink and range in place cuts cost, keeps the timeline short, and avoids a permit. The trade-off is the layout stays as-is. If you’re weighing a bigger scope, our Kitchen Remodeling service covers what a full rework entails.
Expect $14,000 – $45,000, with the low end for a same-layout replacement and the high end for new cabinets, quartz counters, a kitchen island, and a moved sink. Call (844) 797-4868 for an exact free quote – every line item is written out before we start.
Every install we do is covered by our 730-Day Done Right Promise. If something isn’t right, we make it right. Material warranties vary by brand, and we’ll spell those out in writing alongside our own guarantee.
Get a Free Cabinets & Countertops Estimate in Golden Glades
Call (844) 797-4868 and a live person answers, day or night, to schedule your free on-site estimate. We’ll measure the kitchen, walk through the cabinet and stone options that make sense for your space, and hand you a written line-item quote with real prices, not a range. If you’re also planning an Garage Conversion ADU in Golden Glades, we can talk through how the two projects sequence. Projects over $10,000 get $1,000 off, and 0% financing for 18 months is available.
Written by the team at Groundwork Construction Co.