







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Ojus, FL: What It Takes and What It Costs
A garage conversion ADU in Ojus runs $45,000 – $130,000 and usually takes 3 to 5 months from signed scope to final inspection. You’re turning an existing garage bay into a permitted living space, which means framing, insulation, electrical, plumbing, HVAC, and a new entry. Most single-bay conversions land near the low-to-middle of that range. Call (844) 797-4868 for a free on-site estimate.
Key takeaways:
- Typical Ojus garage conversion ADU: $45,000 – $130,000 depending on whether the slab stays and whether you relocate any plumbing.
- Realistic timeline: 3 to 5 months, most of it permitting.
- ZIP 33179 sits at the Miami-Dade/Broward line, so the first decision is often which county’s building department you’re working with.
- Most jobs keep the existing slab and roof structure; those that don’t jump toward the top of the range.
How a garage conversion ADU comes together, stage by stage

Five stages carry this job from a dusty garage to a permitted, livable unit. Here’s the order and the durations, so you know what happens on day one versus day 30.
Stage 1: Feasibility and jurisdiction (week 1)
We measure the bay, check ceiling height, and look at how the slab and roof tie into the main house. On that first walk we confirm setbacks and whether the garage front needs to stay as a façade. The homeowner decision here is scope: full kitchen and bath, or an efficiency-style studio with a half-bath. That single choice swings the budget by tens of thousands.
Stage 2: Permitting and drawings (weeks 1 – 8)
This is where Ojus jobs slow down and where preparation pays off. We submit structural and MEP drawings, and a garage conversion ADU on a corner lot near the county line can require a Miami-Dade Notice of Acceptance (NOA) for certain products while a job two blocks away uses Broward approvals. Expect four to eight weeks. You decide finishes during this window, not on the fly later.
Stage 3: Interior demo and rough-in (weeks 2 – 5 of construction)
Out goes the old garage door, storage and flooring. We frame the new front wall and entry, install the insulated wall assembly, and rough in electrical, plumbing and HVAC. If the slab isn’t flat enough for a real floor system, we pour a self-leveling underlayment. You lock in fixture locations at the pre-drywall walk.
Stage 4: Insulation, drywall and finishes (weeks 5 – 12)
Insulation goes in, drywall closes up, then flooring, trim, cabinets and paint. South Florida humidity means we spec the wall assembly and moisture barrier carefully, so a converted garage doesn’t sweat or grow mold behind the drywall. This stage is where finish-grade choices hit the budget hardest.
Stage 5: Final inspections and walkthrough (weeks 12 – 16)
Electrical, plumbing, mechanical and building inspections clear one by one, then a final. We walk the unit with you, fix the punch list, and hand over the file. The 730-Day Done Right Promise covers the workmanship after that.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that decide what your converted garage becomes
A garage conversion ADU is mostly a series of trade-offs between cost, comfort and future resale. These are the ones that actually matter.
- Keep the slab or raise the floor: leaving the existing concrete saves $3,000 – $8,000, but if the slab is cracked or out of level, a raised subfloor is safer and drier.
- Studio vs. one-bedroom: a studio is cheaper and often enough for a rental or in-law suite; a full bedroom with a closet needs more framing and typically a larger bathroom.
- Kitchenette scope: a sink and small fridge is a light plumbing run; a full kitchen adds cabinetry, a range hood, and more electrical circuits, swinging the number $10,000 – $25,000.
- Bathroom position: the cheapest bathroom is near the existing wet wall. Moving the drain across the slab is doable but pushes toward the high end.
- HVAC: a mini-split is the common pick for one room; extending the home’s duct system suits an open studio.
- Windows and exterior door: they must meet high-velocity hurricane zone requirements in Ojus, so budget for impact-rated units rather than a bargain slider.
Modular systems from companies like Cover and Dvele exist for detached builds, but on a garage conversion the shell is already there, so we focus on the interior assembly and the entry.
What a Garage Conversion ADU costs in Ojus, FL

The lead range for a garage conversion ADU here is $45,000 – $130,000. Where you land depends on five variables that we price line by line, in writing.
- Size and bay count: a single-bay garage is the norm; a two-bay conversion with a full kitchen and bath pushes toward the top.
- Condition of the existing structure: a 1960s block-and-stucco garage may need re-fastening, a repaired slab or new framing that a newer build wouldn’t.
- Relocating plumbing and electrical: running a drain or a service panel to the far side of the garage is where hidden costs live.
- Finish grade: builder-grade flooring and cabinets versus premium surfaces moves the number by $15,000 – $30,000.
- Permit and inspection scope: the two-county reality in Ojus can mean extra plan revisions and product approvals.
A written estimate should itemize demolition, framing, MEP rough-in, insulation, drywall, finishes, permits and the exterior entry. What it typically doesn’t include: landscaping, the old garage-door opening’s exterior look beyond the new wall, or unexpected structural repairs found after demo, which we document before proceeding. No-hassle upfront pricing means the number you see is the number you pay. As part of a full Home Additions & ADU in Ojus plan, the conversion often shares utilities and savings with the rest of the house.
See the difference
Before
After
Before
After
Before
AfterWhat Ojus homes specifically do to this job
Ojus is an unincorporated pocket at the Miami-Dade/Broward line in ZIP 33179, and that geography shapes this work more than any other city factor. Near the county boundary a job can require a Miami-Dade NOA on one side of the street and Broward approvals on the other, so we sort out jurisdiction before drawings. The housing stock here is a mix: post-war 1950s – 70s single-family ranches on modest lots, plus mid-rise condos along Biscayne Blvd/US-1 and Ives Dairy. Our garage conversion ADUs skew toward those older block-and-stucco homes, where we regularly find cracks in the slab, undersized framing and low-slope or hidden tile roofs that need re-fastening to current hurricane uplift schedules. Because Ojus sits in the high-velocity hurricane zone, windows and the exterior door carry NOA product approval, and beach-adjacent humidity means waterproofing and moisture control get careful attention. Condo owners have their own path: association construction rules before any work starts. Neighborhoods off Ives Dairy and near the Aventura edge are where most of these conversions sit.
Serving Ojus, FL – Our Local Coverage Area
We serve Ojus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Garage Conversion ADU in Ojus

Three to five months, with permitting usually the longest single stretch. Construction itself often runs 8 to 12 weeks depending on scope and inspection scheduling. Call (844) 797-4868 for a timeline specific to your garage.
Yes. A converted garage to living space requires a building permit because it adds habitable area, electrical, plumbing and HVAC. Which county issues it depends on where in Ojus you are, near the Miami-Dade/Broward line. We handle that determination and pull the permits for you.
Often, yes. A studio with a bathroom near the existing wet wall and the original roof kept in place is the most economical version and avoids major structural changes. The trade-off is a smaller, simpler unit.
Most Ojus garage conversion ADUs land between $45,000 and $130,000, with the low end for a simple studio that keeps the slab and the high end for a full one-bedroom with a kitchen. Call (844) 797-4868 for an exact quote, and estimates are free.
Every garage conversion ADU we build is covered by the 730-Day Done Right Promise. If something isn’t done right, we make it right. Technicians are background-checked, arrive in uniform, and our lines are answered by a live person 24/7.
Get a free on-site estimate for your garage conversion ADU in Ojus
We’ll walk the garage, measure the bay, and tell you honestly what it takes, then leave you with a written line-item estimate. Call (844) 797-4868 to schedule. Estimates are free, we answer live around the clock, and there’s $1,000 off projects over $10,000 plus 0% financing for 18 months so you can budget with straight numbers. If the driveway also needs work, homeowners often pair this with Asphalt Driveways & Resurfacing in Ojus or Concrete Driveways & Concrete Work in Ojus. Our Home Additions & ADU team covers the full build, and you can see all we do in Ojus.
Written by the team at Groundwork Construction Co.












