AfterWhat Home Renovation Costs Per Square Foot in North Miami Beach, FL
Home renovations in North Miami Beach run roughly $140 to $220 per square foot for a whole-home gut-and-rebuild, and about $90 to $150 per square foot for a cosmetic remodel that leaves the walls and systems alone. A 1,600-square-foot remodel here typically lands between $150,000 and $330,000 depending on how far you go. Call (844) 797-4868 and a live person picks up, 24/7, to walk through your address and give you a real number instead of a national average.
Those national averages floating around at $100 to $200 per square foot don’t hold up in North Miami Beach. The housing stock, the code, and the ground itself push costs higher before you’ve made a single design choice.

Why North Miami Beach Costs More Than the Sunbelt Average
The residential core west of Biscayne Boulevard is built of 1950s to 1970s single-story concrete-block and stucco ranch homes. That construction is durable, but it’s expensive to open up. Three multipliers get baked into nearly every serious renovation here.
- CBS wall work. Cutting into concrete block for a new doorway, a relocated kitchen, or a load-bearing change means saw cutting, added lintels, and structural patching. This runs meaningfully higher than framing work on a wood-frame house.
- Original plumbing behind the walls. Open a wall in a mid-century ranch and you’ll often find cast-iron or galvanized drain lines past their useful life. The building inspector will require you to address them while the wall is open. A full repipe can add thousands to a project you thought was cosmetic.
- Miami-Dade permit fees that scale with project value. Permits are not a flat line item. The higher your project value, the higher your fees, and the more inspection milestones you’ll pass through. Budget for it from the start.
And then there’s the ground. North Miami Beach sits on the Biscayne Aquifer, and a lot of these homes rest on shallow footings just above the water table. Any addition, garage conversion, or excavation typically needs a dewatering plan and a geotechnical report before the city’s building department will issue a foundation permit. None of that shows up in a generic per-square-foot calculator.
Impact Windows Aren’t an Upgrade Here. They’re Code.
North Miami Beach sits inside Miami-Dade County’s High Velocity Hurricane Zone. If your project touches openings, impact-rated windows and doors are the code minimum, not a line you get to add later. A renovation in Atlanta treats upgraded windows as optional. In North Miami Beach, they’re already in the base cost.
That’s why impact window installation in this market runs $9,440 to $29,500, and a standard window replacement package lands between $5,310 and $17,700. Factor those numbers in on the front end and your budget holds. Discover them mid-project and it doesn’t. We specify Andersen and Pella on opening packages so the wind-load ratings and product specs are settled before demolition begins. From foundation to finish line, one contractor owns the whole scope.

Honest Renovation Tiers and What Each One Costs
Cost per square foot only means something when you know what’s being replaced. Here’s how the three tiers break down in North Miami Beach.
Tier 1: Cosmetic
Flooring, paint, fixtures, trim. Walls and systems stay. Call it $90 to $150 per square foot. A kitchen remodel in this range runs $16,520 to $53,100, and a bathroom remodel runs $10,620 to $33,040. The catch: the moment you open a wall for a fixture relocation, you may trigger a plumbing upgrade you didn’t plan for.
Tier 2: Partial Gut
Kitchen or bath plus systems. That means new plumbing in the wet walls, new electrical, and often HVHZ-compliant openings. Expect $150 to $185 per square foot. A walk-in shower installation lands at $5,310 to $14,160, a tub-to-shower conversion at $4,130 to $11,800, and cabinet installation at $4,720 to $15,340.
Tier 3: Full Gut to Studs
Down to the frame, everything replaced, multiple trades intersecting. This is where you land near $185 to $220 per square foot. Home additions run $53,100 to $153,400, ADU construction runs $106,200 to $259,600, and a garage conversion runs $35,400 to $94,400. Groundwork’s material partnerships with KraftMaid cabinets and Cambria quartz mean these mid-to-high tier line items are locked in and specified out of the gate. You’re comparing real specs, not guessing what changed after the contract.
| Project | Cost Range |
|---|---|
| Whole-home renovation, per square foot | $140 - $220 |
| Kitchen remodel | $16,520 - $53,100 |
| Bathroom remodel | $10,620 - $33,040 |
| Cabinet installation | $4,720 - $15,340 |
| Countertop installation | $2,360 - $7,670 |
| Impact window installation | $9,440 - $29,500 |
| Roof replacement | $9,440 - $23,600 |
| Home addition | $53,100 - $153,400 |
| ADU construction | $106,200 - $259,600 |
| Garage conversion | $35,400 - $94,400 |
Every project comes with upfront pricing and no surprises, backed by 0% financing for 18 months and $1,000 off projects over $10,000.
The Accountability Layer Cost Calculators Skip
Full-gut renovations fail in the seams. The framer leaves, the plumber arrives, the electrician follows, and nobody owns the gaps between trades. That’s where callbacks happen and where most per-square-foot estimates fall apart in practice.
The 730-Day Done Right Promise covers two full years on workmanship. If it’s not done right, we make it right. Our technicians bring up to 12 years of experience to the job, are background-checked, and arrive in uniform. It’s the part of the number a spreadsheet will never show you: built to last, backed in writing.
Before you commit to any figure, it helps to understand how scope drives cost rather than chasing a per-foot average that ignores your house. Site drainage and waterproofing matter too, given the high water table and South Florida downpours, so factor those in on any project touching the slab or grade.
FAQs
Plan on $140 to $220 per square foot for a full gut renovation and $90 to $150 per square foot for a cosmetic refresh. The higher end reflects CBS concrete-block modification, cast-iron pipe replacement when walls open, and HVHZ-compliant openings, all of which are built into the local base. Call (844) 797-4868 for an exact quote on your address.
A kitchen or bath remodel is almost always cheaper than an addition. A bathroom remodel runs $10,620 to $33,040 while a home addition runs $53,100 to $153,400, because additions trigger foundation, dewatering, and full permit scope. Call (844) 797-4868 and we’ll tell you honestly which makes more sense for your lot.
Yes, if your project touches openings. North Miami Beach sits inside the High Velocity Hurricane Zone, so impact-rated windows and doors are the code minimum, not an optional upgrade. Impact window installation runs $9,440 to $29,500. Call (844) 797-4868 and we’ll spec the right package before demo starts.
We answer calls live 24/7, so you can reach a real person today, and we’ll schedule your free project estimate and design consult around your timeline. There’s no voicemail and no waiting until Monday. Call (844) 797-4868 and we’ll get you on the calendar.
Get a Real Number, Not a National Average
Your North Miami Beach home isn’t the national average, and your renovation budget shouldn’t be priced like one. Get a free project estimate and design consult from Groundwork Construction Co. of North Miami Beach, backed by upfront pricing and the 730-Day Done Right Promise. Call (844) 797-4868 today. A live person answers 24/7.
Written by the team at Groundwork Construction Co. of North Miami Beach, serving North Miami Beach, FL.
What Our Customers Say
"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett