A Groundwork company - serving North Miami Beach, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · North Bay Village, FL

Garage Conversion ADU in North Bay Village - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Miami Beach
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in North Bay Village, FL: What It Costs and How Long It Takes

A garage conversion ADU in North Bay Village typically runs $45,000 to $130,000 and takes 10 to 16 weeks from permit approval to final inspection. The work turns an existing attached or detached garage into a permitted dwelling unit: new slab or floor system, framed walls, insulation, plumbing, electrical, impact glazing, and a separate entry. On these islands the permit path matters as much as the build. Call (844) 797-4868 to schedule a free on-site estimate.

Call (844) 797-4868

How the work actually runs, week by week

A garage converted into a guest room and home office

Every conversion we build in North Bay Village follows the same five stages. What changes is the pace, because Miami-Dade County and Village building department review both sit on the timeline.

Stage 1: Measure, survey, and drawings (weeks 1 to 3)

We measure the garage, confirm ceiling height and slab condition, and check the flood elevation for the parcel. You decide the layout at this point: studio versus one-bedroom, kitchenette or not, bathroom position. Your decisions here set the plumbing and electrical paths for everything that follows, so we don’t rush them. Drawings go to the Village for review.

Stage 2: Demolition and structural prep (week 1 after permit)

The garage door comes out and gets framed in or replaced with impact-rated glazing. We demo interior finishes, cut the slab where drains go, and inspect for the salt-air corrosion that’s common on older island structures. You choose at this stage whether the old door opening becomes a wall with windows or a set of French doors facing the water side.

Stage 3: Rough-in trades and the first inspection (weeks 2 to 5)

Plumbing lines run to the new bathroom and kitchenette, electrical gets pulled to a subpanel, and HVAC goes in. The Village inspects rough framing, rough plumbing, rough electrical, and mechanical before anything closes up. This is the one stage where a failed inspection costs real days, which is why we build in slack.

Stage 4: Insulation, drywall, and finishes (weeks 6 to 11)

Spray foam or batt insulation goes in, drywall hangs and finishes, then flooring, cabinets, tile, fixtures, and paint. You pick finishes during stage 1, not here, so materials are on site when the crew needs them. On the islands, delivery scheduling is its own job.

Stage 5: Final inspections and punch list (weeks 12 to 16)

Final building, electrical, plumbing, and mechanical inspections, then the certificate of occupancy. We walk the unit with you, write up anything that needs correcting, and fix it before we close out. Everything we build is covered by our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that change what you get

Most of the cost swing in a garage conversion ADU comes down to four decisions. Here’s the honest trade-off on each.

  • Slab-on-grade versus raised floor. Keeping the existing slab is the cheapest path and works if it’s level and dry. On low-lying North Bay Village parcels, a raised floor with a vapor barrier costs more but handles tidal groundwater better. Worth it near the bay.
  • Bathroom position. A bathroom stacked against an existing drain line saves thousands. Moving the drain across the slab means cutting and re-pouring concrete, and on a 1950s or 70s waterfront home that can mean surprises under the floor.
  • Impact glazing versus shutters. North Bay Village sits in the high-velocity hurricane zone, so the new openings need impact-rated windows and doors or an approved shutter system. Impact glass costs more up front and delivers a cleaner look and easier insurance conversation.
  • Kitchenette versus full kitchen. A compact kitchenette with a sink, two-burner cooktop, and under-counter fridge fits a studio ADU fine. A full kitchen adds plumbing, ventilation, and appliance cost, and it only pays off if you plan to rent long-term.
  • Detached garage walls. The old workshop-style garages here often have single-skin block walls with no insulation. Furring out and insulating adds cost, but a bare block wall sweats in this humidity.

For slab patching and small concrete repairs we use Sakrete products because they’re consistent and available. When the garage is a detached structure with its own footprint, site work often overlaps with what we do on Concrete Driveways & Concrete Work in North Bay Village, and homeowners frequently pair the two to keep one crew on site.

What a Garage Conversion ADU costs in North Bay Village, FL

A framer checking new wall framing on a home addition

Expect $45,000 to $130,000 for a permitted conversion. The low end covers a straightforward studio in a sound attached garage with the bathroom near existing plumbing. The high end is a one-bedroom with a full kitchen, raised floor, impact glazing throughout, and a detached garage needing new walls and roof tie-ins. Here’s the line-item breakdown:

Line item Typical range
Design, drawings, permit fees $4,000 – $12,000
Demolition and door infill $3,000 – $9,000
Slab and floor system $4,000 – $14,000
Framing, insulation, drywall $8,000 – $22,000
Plumbing and bathroom $6,000 – $18,000
Electrical and subpanel $4,000 – $11,000
HVAC $3,500 – $9,000
Impact windows and doors $6,000 – $20,000
Finishes, flooring, kitchenette $6,000 – $15,000

Four things push a job toward the top of that range: square footage, the condition of the existing structure, how far plumbing and electrical have to travel, and whether the permit scope includes a new roof or impact upgrade on the whole garage. Our estimates are written line-item and fixed – the number you see is the number you pay. No change orders for work we scoped.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What North Bay Village homes specifically do to this job

North Bay Village is three islands – Harbor Island, Treasure Island, and North Bay Island – joined by the John F. Kennedy Causeway, and that geography shapes every conversion. Nearly all work happens on dense waterfront parcels with tight lot access. The Village runs its own building department review and inspections on top of Miami-Dade County’s requirements, and parcels here fall under strict flood-plain permitting, so what’s routine on the mainland becomes a code puzzle on the islands. On Harbor Island and Treasure Island we most often work in 1950s to 1970s single-family homes where the attached garage has a shallow slab and block walls that have absorbed decades of salt air. That salt spray eats cheap exterior fasteners within a season, so we spec corrosion-rated hardware on everything exposed. Staging is the other half of the job: narrow causeway access and near-zero side-yard setbacks mean material deliveries and dumpster placement have to be scheduled around bridge traffic and neighbors’ driveways.

Serving North Bay Village, FL – Our Local Coverage Area

We serve North Bay Village and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – Garage Conversion ADU in North Bay Village

A galley kitchen opened up to the dining room with a new peninsula

Get a free on-site estimate for your garage conversion

We’ll come out, measure the garage, check the slab and flood elevation, and talk through layout options. You leave the visit with a written, fixed line-item estimate and a realistic schedule. No pressure, no vague numbers. Call (844) 797-4868 to book your free estimate. If the conversion is part of a wider plan, our Home Additions & ADU team handles the rest, and you can see the full scope on our Home Additions & ADU in North Bay Village page. We cover the whole island community – see our North Bay Village service area for details.

Written by the team at Groundwork Construction Co.

Why North Bay Village Chooses Groundwork Construction Co. of North Miami Beach

We set the standard for garage conversion ADU in North Bay Village.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in North Bay Village

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Bay Village Customers Say

Trusted by homeowners across North Bay Village and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porch

More services in North Bay Village

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Miami Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Miami Beach team

A local vetted partner works across North Miami Beach and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in North Bay Village?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in North Bay Village.

(844) 797-4868

Request a Free Estimate in North Bay Village

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch