A Groundwork company - serving North Miami Beach, FL
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Ojus, FL

ADU Design & Permitting in Ojus - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Miami Beach
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Ojus, FL: What It Takes and What It Costs

ADU Design & Permitting in Ojus runs $45,000 – $130,000 for the design-and-permit phase on a typical project, and getting to an approved permit usually takes 3 to 6 months depending on which county reviews your plans. The design work itself is fast; the product approval and jurisdiction decisions are where the calendar stretches. Call (844) 797-4868 and we’ll walk your lot, confirm which building department governs it, and tell you what a realistic approval timeline looks like before you spend a dollar on drawings.

Call (844) 797-4868

How We Take an ADU From Sketch to Approved Permit

A garage converted into a guest room and home office

Ojus sits in an unincorporated pocket where the first decision is jurisdiction, not square footage. Everything downstream depends on getting that right, so the sequence below is ordered around it.

Stage 1: Jurisdiction and lot check (week 1)

Before any drawing exists, we pull the parcel record and confirm whether the property falls under Miami-Dade or Broward review, which side of the county line the street sits on, and what the underlying zoning allows for a secondary dwelling unit. We also check setbacks, lot coverage and the location of the existing sewer or septic, because those constraints shape the footprint more than anything the homeowner wants. You decide at this stage: detached or attached, and roughly how much floor area you’re targeting.

Stage 2: Schematic design and feasibility memo (weeks 2 – 4)

We produce a scaled site plan showing the proposed unit, driveway access, utility runs and setbacks, plus a short memo on what your jurisdiction will and won’t approve. This is where most Ojus projects either lock in or pivot. You decide the layout priorities here: one bedroom versus two, a full kitchen versus a kitchenette, and whether the unit shares a wall with the main house or stands alone.

Stage 3: Construction drawings and product approval (weeks 4 – 10)

Full drawings go out covering architectural, structural, electrical, plumbing and mechanical. Because Ojus is in the high-velocity hurricane zone, every window, door, shutter and roof assembly has to carry a valid Miami-Dade Notice of Acceptance or the Broward equivalent. We build that schedule into the drawing set so the plan reviewer isn’t sending it back for missing product approvals. You approve finishes and equipment at this point: impact glazing, roofing system, water heater type.

Stage 4: Submittal and plan review (weeks 10 – 22)

We submit, track the review, respond to comments and resubmit as needed. Review cycles in this corridor run 4 to 8 weeks per round, and two rounds is common on a first ADU submittal. You decide nothing during review except how to handle any comment that changes scope; we handle the correspondence and keep you posted on each cycle.

Stage 5: Permit issuance and pre-construction (weeks 22 – 26)

Once the permit is issued we lock the build schedule, confirm utility coordination and set the inspection sequence the county will hold us to: foundation, framing, rough-in, insulation, final. You get a written schedule and a single point of contact. Your build doesn’t start the day you sign; it starts the day the permit card is on the wall, and we plan around that reality rather than promising against it.

This design-and-permit work is the front half of a larger project. For how it fits into the full build, see Home Additions & ADU in Ojus.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Design and Spec Choices You’ll Actually Make

Most of the money decisions on an Ojus ADU happen in the design phase, not the build. Here’s where the real trade-offs sit.

  • Detached versus attached: A detached unit gives privacy and often fits a deeper lot, but it means separate utility runs, its own roof and its own foundation, which pushes you toward the top of the range. An attached unit shares walls and services and typically lands lower, at the cost of less separation from the main house.
  • Prefab versus site-built: Panelized and modular packages, the kind Abodu and Dvele build, can shorten the shell schedule and standardize quality, but they still have to clear local product approval and site-specific foundation work. Site-built gives you more freedom on footprint and finish.
  • Impact glazing: Required in this wind zone, and the choice between standard impact windows and a full impact door-and-shutter package moves the number. Windows alone are the common path; full packages cost more but simplify future insurance conversations.
  • Foundation type: Slab-on-grade is standard for a detached unit on a modest lot. A raised or stem-wall foundation costs more but handles poor drainage better during the summer storm season.
  • Roof system: A low-slope membrane roof is cheaper up front; a hip roof with shingles or tile matches the main house and hides better from the street. Tile adds weight and cost and demands engineered fastening.
  • Kitchen level: A full kitchen versus a kitchenette changes both cost and how the unit can be used. A kitchenette keeps the unit non-cooking and simpler to permit; a full kitchen means real plumbing and appliance circuits.

Concrete and slab work often uses standard bagged mix such as Sakrete on smaller pours, while the structural package is engineered to the county’s uplift schedule. Homeowners often pair an ADU project with Paver Driveways in Ojus so the new unit gets its own access and parking, and Chain Link Fence in Ojus if they want to define a yard line between the units.

What ADU Design & Permitting Costs in Ojus, FL

A framer checking new wall framing on a home addition

Design and permitting for an Ojus ADU runs $45,000 – $130,000 when it’s bundled into the full project, and the design-and-permit line alone typically lands in the lower part of that band. Here’s what moves the number:

Factor Low end High end
Unit size ~500 sq ft 900+ sq ft
Attachment Attached, shared walls Detached, full utilities
Foundation Standard slab Engineered or raised
Review rounds One clean cycle Multiple resubmittals
Product approval Standard impact package Custom or specialty glazing

What a written estimate includes: site plan, architectural and structural drawings, MEP sheets, the product approval schedule, submittal and review tracking, and permit fees we can confirm at the counter. What it typically doesn’t include: impact fee assessments charged at permit issuance, utility connection charges, survey work if the lot lines aren’t clear, and any HOA architectural review fees. We put those in writing as separate lines so there are no surprises once work is underway. Upfront pricing, no surprises, and the 730-Day Done Right Promise back the entire job.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Ojus Homes Specifically Do to This Job

The defining feature of building here is the county-line split. Ojus straddles Miami-Dade and Broward in ZIP 33179, so a job a few blocks away can require a Broward permit while yours needs Miami-Dade product approval, and the two review processes don’t move at the same speed. We confirm jurisdiction before we draw a line, because a submittal to the wrong department burns weeks. The housing stock compounds it: Ojus is post-war 1950s – 70s single-family ranches on modest lots, often block-and-stucco, plus mid-rise and high-rise condos along the Biscayne Blvd/US-1 and Ives Dairy corridor. On the older ranches, we regularly find clay-tile or low-slope roofs that need re-fastening to current hurricane uplift schedules before an ADU can share the lot cleanly, and stucco walls that need careful waterproofing against the year-round humidity and afternoon storms. Condo associations along that corridor impose their own construction rules, so ADU work on those parcels usually means clearing association review in addition to the county’s.

Serving Ojus, FL – Our Local Coverage Area

We serve Ojus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Design & Permitting in Ojus

A remodeled kitchen with a waterfall island and wood cabinets

Get a Free Estimate for Your Ojus ADU

We’ll come out to your Ojus property, confirm which building department governs it, check setbacks and utility locations, and give you a written line-item estimate for design and permitting with no obligation. Call (844) 797-4868 and a live person answers around the clock. You’ll leave the call knowing your jurisdiction, your likely timeline and your number. For the broader project scope, see our Home Additions & ADU service, or visit our Ojus service area page to see what else we handle nearby.

Written by the team at Groundwork Construction Co.

Why Ojus Chooses Groundwork Construction Co. of North Miami Beach

We set the standard for ADU design & permitting in Ojus.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Ojus

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Ojus Customers Say

Trusted by homeowners across Ojus and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gate

More services in Ojus

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Miami Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Miami Beach team

A local vetted partner works across North Miami Beach and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Ojus?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Ojus.

(844) 797-4868

Request a Free Estimate in Ojus

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch