There’s a catch in this brief. The editorial spine (detached workshops, acreage, heavy-duty garage doors, long rural service drives) describes a rural property profile, and North Bay Village is a three-island waterfront municipality with narrow causeway access and near-zero side yards. I’ve built the page around the version of that spine that actually exists here: dense waterfront parcels, salt air, one-trip execution, and heavy-duty materials chosen for a coastal environment. I did not write acreage or workshop language, because it would be false for this city and would fail the local-signal requirement. Here is the page.
Cabinets & Countertops in North Bay Village, FL: Cost, Timeline and What the Job Actually Involves
Cabinets & Countertops in North Bay Village typically run $14,000 – $45,000 for a full replacement, and most jobs take two to three weeks from demo to final caulk. Cabinet installation alone lands at $4,000 – $13,000 and countertop installation at $2,000 – $6,500 on this island market. Call (844) 797-4868 for a free on-site estimate with line-item pricing. Our technicians have up to 12 years of experience, and every project carries our 730-Day Done Right Promise.
How the job runs, stage by stage

On a North Bay Village waterfront parcel, the schedule matters as much as the carpentry. Deliveries have to slot around causeway traffic, and dumpster placement on a lot with almost no side yard becomes a logistics call, not an afterthought. Here’s the real sequence.
Day 1: site protection and demo. We cover floors and counters, shut off water at the cabinet runs, and pull the old boxes and tops. A standard kitchen takes one to two days. If we find soft drywall behind a sink cabinet (salt air finds the cheap fasteners first), we flag it before we close anything up, and you decide then whether we replace that section.
Days 2 through 4: rough-in and prep. This is where plumbing and electrical get repositioned if the new layout needs it, and where walls get patched and primed so new cabinets aren’t hung against a rough surface. You confirm the final cabinet layout and the outlet and valve positions at the start of this stage; changes after this point cost real money.
Days 5 through 9: cabinet set and leveling. Upper and lower cabinets go in, get shimmed and leveled, and doors and drawers are aligned. Shaker and flat-slab fronts go faster than inset doors, which need individual fitting and add two to three days. You approve the door reveal and hardware placement here.
Days 10 through 12: template and countertop install. Stone tops are templated after cabinets are set, not before, then fabricated and installed with the sink cutout and faucet holes drilled. This is the stage that surprises people: the stone shop has the template for three to five days, so the kitchen sits half-finished and you should plan to eat out.
Days 13 through 15: finish and walkthrough. Backsplash, final plumbing connections, hardware, caulk and cleanup. We walk the job with you, and anything on the punch list gets handled before we call it done.
You’ll make about four decisions across those three weeks: layout confirmation, cabinet finish and door style, countertop slab selection, and hardware. Everything else is ours.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually sit down and make
Cabinets and countertops come down to five decisions, and each one trades cost against how it holds up on a salt-air island.
- Cabinet box material: plywood boxes cost more than particleboard but survive humidity swings far better. In North Bay Village, where the air is wet most of the year, we default to plywood for anything below the counter.
- Door style: painted MDF shaker is the value pick and looks sharp, but it chips. Solid wood or thermofoil holds up better near a range. Inset doors are the premium option and add fitting time.
- Drawers and hardware: full-extension soft-close slides are worth the upgrade on every drawer you’ll open daily. Cheap slides fail first.
- Countertop material: quartz is the low-maintenance default and resists staining; granite is tougher against heat but needs sealing; butcher block is warm and cheap but wants maintenance. Edge profile and slab thickness move the price more than people expect.
- Brand tier: a name like KraftMaid gives you a real warranty and predictable lead times. Bargain boxes can save thousands up front and cost you in replacement doors two years in.
What Cabinets & Countertops costs in North Bay Village, FL

Expect $14,000 – $45,000 for a full replacement, with the low end being a modest kitchen with stock-grade cabinets and a mid-range quartz, and the high end being a large waterfront kitchen with custom millwork, an island, and premium stone. Here are the line items we quote separately.
| Line item | Range in North Bay Village |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Backsplash installation | $800 – $2,500 |
Five things push a job toward the top of that range. Kitchen size and cabinet count come first. Existing condition comes second, because a 1960s Harbor Island kitchen often hides out-of-square walls and outdated wiring. Relocating plumbing or a gas line for a sink move, or taking down a wall for an island, adds real labor. Material grade is the fourth lever, and it’s the one you control most directly. Permit scope is the fifth: if the layout moves plumbing or electrical, the job needs a permit and an inspection, and that adds time and cost.
A written estimate from us lists cabinets, tops, labor, disposal, permit fees where they apply, and the finish work. It does not cover a hidden water-damaged subfloor or a wall that turns out to be load-bearing; those get quoted separately in writing, with your approval, before anyone touches them. Upfront pricing means the number you see is the number you pay for the scope we agreed on.
See the difference
Before
After
Before
After
Before
AfterWhat North Bay Village homes do to this job
North Bay Village is three islands, Harbor Island, Treasure Island and North Bay Island, joined by the John F. Kennedy Causeway. That geography shapes a cabinet job more than most homeowners expect. Parcels are dense and waterfront, side yards are nearly nonexistent, and material deliveries and dumpster placement have to be scheduled around bridge traffic and neighbors’ driveways. Salt spray off Biscayne Bay corrodes cheap exterior fasteners within a season, so we spec hardware and connectors that survive it.
The Village runs its own building department, and reviews and inspections go through the municipality rather than unincorporated Miami-Dade County. Add Miami-Dade’s 40-year recertification scrutiny and flood-plain permitting, and a cabinet job that moves a sink or a range circuit becomes a code-and-logistics puzzle rather than a routine swap. Much of the housing stock is 1950s to 1970s waterfront single-family construction, where we regularly find sagging cabinet bases over old tile and walls that aren’t square. If the scope grows past the kitchen, that’s usually part of a full Kitchen Remodeling in North Bay Village rather than a standalone swap, and it’s covered in our Kitchen Remodeling service. We cover the whole of North Bay Village, and where a homeowner is reworking an attached garage at the same time, they often pair this with a Garage Conversion ADU in North Bay Village or a New Detached ADU in North Bay Village.
Serving North Bay Village, FL – Our Local Coverage Area
We serve North Bay Village and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Cabinets & Countertops in North Bay Village

Most jobs take two to three weeks from demo to final walkthrough, with the stone template and fabrication window being the longest single gap. Small kitchens run faster; inset doors and a relocated sink add days. Call (844) 797-4868 and we’ll give you a schedule against your actual layout.
You need a permit when the job moves plumbing, gas or electrical, or changes the layout. A straight swap of boxes and tops in the same footprint usually doesn’t require one. The Village’s building department reviews these, so we check the scope before we quote and tell you plainly whether a permit is in play. Call (844) 797-4868 to talk through your project.
Yes, and it’s the most common approach. Keeping the sink and range in place lets us reuse the existing rough-in and keeps the job to a straight swap. If you want a new layout, we handle the plumbing and electrical moves and the permit that goes with them. Estimates are free.
Most full replacements land between $14,000 and $45,000, with cabinet installation at $4,000 – $13,000 and countertops at $2,000 – $6,500. Size, existing condition, layout changes and material grade move the number. Call (844) 797-4868 for an exact quote, with line-item pricing and no surprises.
Every project is covered by our 730-Day Done Right Promise: if it isn’t done right, we make it right. Cabinet and stone manufacturer warranties sit on top of that. You’ll get the terms in writing before work starts, and a live person answers our phone 24/7.
Get a free estimate for Cabinets & Countertops in North Bay Village
Call (844) 797-4868 to schedule a free on-site estimate and design consult. We’ll measure the space, check the walls and existing rough-in, and hand you a written line-item quote covering cabinets, countertops, labor and disposal. Projects over $10,000 qualify for $1,000 off, and 0% financing for 18 months is available. No pressure on the call, just numbers you can plan around.