Garage Conversion ADU in North Bay Village, FL: What It Costs and How Long It Takes
A garage conversion ADU in North Bay Village typically runs $45,000 to $130,000 and takes 10 to 16 weeks from permit approval to final inspection. The work turns an existing attached or detached garage into a permitted dwelling unit: new slab or floor system, framed walls, insulation, plumbing, electrical, impact glazing, and a separate entry. On these islands the permit path matters as much as the build. Call (844) 797-4868 to schedule a free on-site estimate.
How the work actually runs, week by week

Every conversion we build in North Bay Village follows the same five stages. What changes is the pace, because Miami-Dade County and Village building department review both sit on the timeline.
Stage 1: Measure, survey, and drawings (weeks 1 to 3)
We measure the garage, confirm ceiling height and slab condition, and check the flood elevation for the parcel. You decide the layout at this point: studio versus one-bedroom, kitchenette or not, bathroom position. Your decisions here set the plumbing and electrical paths for everything that follows, so we don’t rush them. Drawings go to the Village for review.
Stage 2: Demolition and structural prep (week 1 after permit)
The garage door comes out and gets framed in or replaced with impact-rated glazing. We demo interior finishes, cut the slab where drains go, and inspect for the salt-air corrosion that’s common on older island structures. You choose at this stage whether the old door opening becomes a wall with windows or a set of French doors facing the water side.
Stage 3: Rough-in trades and the first inspection (weeks 2 to 5)
Plumbing lines run to the new bathroom and kitchenette, electrical gets pulled to a subpanel, and HVAC goes in. The Village inspects rough framing, rough plumbing, rough electrical, and mechanical before anything closes up. This is the one stage where a failed inspection costs real days, which is why we build in slack.
Stage 4: Insulation, drywall, and finishes (weeks 6 to 11)
Spray foam or batt insulation goes in, drywall hangs and finishes, then flooring, cabinets, tile, fixtures, and paint. You pick finishes during stage 1, not here, so materials are on site when the crew needs them. On the islands, delivery scheduling is its own job.
Stage 5: Final inspections and punch list (weeks 12 to 16)
Final building, electrical, plumbing, and mechanical inspections, then the certificate of occupancy. We walk the unit with you, write up anything that needs correcting, and fix it before we close out. Everything we build is covered by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that change what you get
Most of the cost swing in a garage conversion ADU comes down to four decisions. Here’s the honest trade-off on each.
- Slab-on-grade versus raised floor. Keeping the existing slab is the cheapest path and works if it’s level and dry. On low-lying North Bay Village parcels, a raised floor with a vapor barrier costs more but handles tidal groundwater better. Worth it near the bay.
- Bathroom position. A bathroom stacked against an existing drain line saves thousands. Moving the drain across the slab means cutting and re-pouring concrete, and on a 1950s or 70s waterfront home that can mean surprises under the floor.
- Impact glazing versus shutters. North Bay Village sits in the high-velocity hurricane zone, so the new openings need impact-rated windows and doors or an approved shutter system. Impact glass costs more up front and delivers a cleaner look and easier insurance conversation.
- Kitchenette versus full kitchen. A compact kitchenette with a sink, two-burner cooktop, and under-counter fridge fits a studio ADU fine. A full kitchen adds plumbing, ventilation, and appliance cost, and it only pays off if you plan to rent long-term.
- Detached garage walls. The old workshop-style garages here often have single-skin block walls with no insulation. Furring out and insulating adds cost, but a bare block wall sweats in this humidity.
For slab patching and small concrete repairs we use Sakrete products because they’re consistent and available. When the garage is a detached structure with its own footprint, site work often overlaps with what we do on Concrete Driveways & Concrete Work in North Bay Village, and homeowners frequently pair the two to keep one crew on site.
What a Garage Conversion ADU costs in North Bay Village, FL

Expect $45,000 to $130,000 for a permitted conversion. The low end covers a straightforward studio in a sound attached garage with the bathroom near existing plumbing. The high end is a one-bedroom with a full kitchen, raised floor, impact glazing throughout, and a detached garage needing new walls and roof tie-ins. Here’s the line-item breakdown:
| Line item | Typical range |
|---|---|
| Design, drawings, permit fees | $4,000 – $12,000 |
| Demolition and door infill | $3,000 – $9,000 |
| Slab and floor system | $4,000 – $14,000 |
| Framing, insulation, drywall | $8,000 – $22,000 |
| Plumbing and bathroom | $6,000 – $18,000 |
| Electrical and subpanel | $4,000 – $11,000 |
| HVAC | $3,500 – $9,000 |
| Impact windows and doors | $6,000 – $20,000 |
| Finishes, flooring, kitchenette | $6,000 – $15,000 |
Four things push a job toward the top of that range: square footage, the condition of the existing structure, how far plumbing and electrical have to travel, and whether the permit scope includes a new roof or impact upgrade on the whole garage. Our estimates are written line-item and fixed – the number you see is the number you pay. No change orders for work we scoped.
See the difference
Before
After
Before
After
Before
AfterWhat North Bay Village homes specifically do to this job
North Bay Village is three islands – Harbor Island, Treasure Island, and North Bay Island – joined by the John F. Kennedy Causeway, and that geography shapes every conversion. Nearly all work happens on dense waterfront parcels with tight lot access. The Village runs its own building department review and inspections on top of Miami-Dade County’s requirements, and parcels here fall under strict flood-plain permitting, so what’s routine on the mainland becomes a code puzzle on the islands. On Harbor Island and Treasure Island we most often work in 1950s to 1970s single-family homes where the attached garage has a shallow slab and block walls that have absorbed decades of salt air. That salt spray eats cheap exterior fasteners within a season, so we spec corrosion-rated hardware on everything exposed. Staging is the other half of the job: narrow causeway access and near-zero side-yard setbacks mean material deliveries and dumpster placement have to be scheduled around bridge traffic and neighbors’ driveways.
Serving North Bay Village, FL – Our Local Coverage Area
We serve North Bay Village and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Garage Conversion ADU in North Bay Village

Ten to sixteen weeks from permit approval, with the permit review itself adding several weeks before that. The two inspections that drive the schedule are the rough-in inspection and the final, and both are Village-controlled. Call (844) 797-4868 and we’ll walk you through the timeline for your specific garage.
Yes. Any conversion that creates a dwelling unit requires building, electrical, plumbing, and mechanical permits, and the Village inspects each phase. We pull the permits and coordinate the inspections as part of the job. Skirting this step is how conversions get flagged at resale, so we don’t offer a shortcut version.
Often yes, if the bathroom lands near an existing drain line and the garage walls are sound. Keeping the plumbing in place saves several thousand dollars and a week or two. We confirm what’s possible during the first site visit, before drawings are finalized, so the estimate reflects reality.
$45,000 to $130,000, depending on size, structure condition, plumbing distance, and impact glazing. Every estimate is written line-item and fixed, and projects over $10,000 qualify for $1,000 off plus 0% financing for 18 months. Call (844) 797-4868 for an exact quote – estimates are free.
Every conversion is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Your technicians are background-checked and arrive in uniform, and calls are answered by a live person 24/7.
Get a free on-site estimate for your garage conversion
We’ll come out, measure the garage, check the slab and flood elevation, and talk through layout options. You leave the visit with a written, fixed line-item estimate and a realistic schedule. No pressure, no vague numbers. Call (844) 797-4868 to book your free estimate. If the conversion is part of a wider plan, our Home Additions & ADU team handles the rest, and you can see the full scope on our Home Additions & ADU in North Bay Village page. We cover the whole island community – see our North Bay Village service area for details.