A Groundwork company - serving North Miami Beach, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Sunny Isles Beach, FL

Garage Conversion ADU in Sunny Isles Beach - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Miami Beach
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Sunny Isles Beach, FL: What the Job Actually Involves

A garage conversion ADU in Sunny Isles Beach typically runs $45,000 to $130,000 and takes three to six months from demolition to final inspection. You’re turning an existing garage footprint into a legal, permitted living unit, which means framing, insulation, electrical, plumbing, and impact-rated glazing all have to meet Miami-Dade code. The wide range comes down to whether you keep the slab and basic layout or move plumbing and add a full kitchen. Call (844) 797-4868 for a free on-site estimate.

Call (844) 797-4868

How the Conversion Unfolds, Stage by Stage

A garage converted into a guest room and home office

Most homeowners assume the garage is the easy part of an ADU. In this city it usually isn’t, because the garage is almost always the least documented, least updated space on the property. Here’s the real sequence, with what you decide at each point.

Stage 1: Assessment and drawings (weeks 1 to 4)

Day one is measuring the slab, checking the garage door header, and mapping where the existing electrical panel and any plumbing stub-outs sit. We confirm ceiling height and drainage slope, both of which quietly decide whether your layout works. You sign off on the floor plan and elevation drawings. This is also when the permit application gets built, since the county wants drawings before anything gets touched.

Stage 2: Demolition and slab work (weeks 5 to 7)

Out go the vehicle door, opener tracks, and any shelving or storage build-outs. The old door opening gets framed and closed off, and we pour or level any slab sections that fail the moisture test. You’ll choose here whether the garage floor stays as exposed concrete or gets a finished floor over it. If the slab drains toward the street incorrectly, we fix the slope now, not after cabinets go in.

Stage 3: Framing, rough-in, and weather barrier (weeks 8 to 12)

New interior walls go up to divide living and sleeping space, then electrical, plumbing, and HVAC rough-ins get run and inspected before anything closes up. You’ll decide appliance locations and fixture rough-in heights at this stage, because moving an outlet later means opening a finished wall. The exterior wall that used to hold the garage door gets sheathed, waterproofed, and stuccoed; on the ocean-facing side of a property, that stucco gets a corrosion-resistant fastening system.

Stage 4: Insulation, drywall, and finishes (weeks 13 to 22)

Insulation, drywall, and ceiling go in, then flooring, cabinetry, fixtures, and paint. This is the longest stretch and where most of your finish choices land: floor material, cabinet line, countertop, paint. We schedule inspections alongside the trades so nothing sits waiting on a county inspector’s calendar longer than it has to.

Stage 5: Final inspection and handoff (weeks 23 to 26+)

Final inspection covers electrical, plumbing, mechanical, and the certificate of occupancy. Once it passes, you get a walkthrough, a punch list, and the unit is legally occupiable. You’ll decide at this stage whether to pursue the ADU as a rental unit or as family housing, since rental use can bring added parking or registration requirements.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your Conversion

Most of the cost swing in a garage conversion ADU is settled in four decisions. Here’s the honest trade-off on each:

  • Flooring: Sealed and polished concrete is the cheapest and toughest option and handles the humidity well, but it feels utilitarian. Luxury vinyl plank adds warmth and installs over a level slab at moderate cost. Tile runs higher but handles moisture best if the unit includes a bathroom near the entry.
  • Kitchen scope: A kitchenette with a sink, mini-fridge, and two-burner cooktop keeps plumbing minimal and cost down. A full kitchen with a range, dishwasher, and full-size fridge pushes you toward the top of the range and may require an electrical service upgrade.
  • Impact glazing: All windows and the new entry door need to meet Miami-Dade wind-borne debris requirements. Impact-rated units cost more upfront but eliminate shutters and satisfy insurance carriers. Standard windows won’t pass inspection here.
  • Ceiling and height: If the existing garage ceiling is low, a raised or vaulted ceiling adds headroom and resale value but adds framing and drywall cost. Keeping the existing ceiling height is the budget choice.
  • Prefab versus site-built: Some homeowners explore prefab panels from manufacturers like Dvele or Mighty Buildings for detached units, but a garage conversion is fundamentally a site-built interior build-out, so prefab usually doesn’t apply unless the garage is being replaced entirely.

What a Garage Conversion ADU Costs in Sunny Isles Beach, FL

A framer checking new wall framing on a home addition

The full range for this job is $45,000 to $130,000. A basic one-bedroom conversion keeping the existing slab, layout, and a kitchenette sits near $45,000 to $65,000. A full one-bedroom with a complete kitchen, upgraded finishes, and new impact windows lands around $85,000 to $130,000.

Four things push the number:

  • Size and layout changes: Every new interior wall and doorway adds framing, drywall, and finish work. A single open studio is the low end; a two-bedroom layout is the high end.
  • Plumbing and electrical relocation: Adding a bathroom or kitchen where no drain or circuit exists means cutting the slab and running new lines, which is one of the biggest single cost drivers.
  • Structural work: Removing or reinforcing a load-bearing wall, or raising a low ceiling, adds engineering and framing cost.
  • Finish grade: Builder-grade cabinets and vinyl flooring sit at the bottom; custom cabinetry and tile throughout push toward the top.
  • Permit scope: A full ADU permit with certificate of occupancy costs more in fees and inspection time than a partial remodel permit.

A written estimate from us breaks out demolition, framing, electrical, plumbing, HVAC, finishes, and permit fees as separate line items, so you can see exactly where the money goes. Upfront pricing, no surprises. What’s not included: furniture, appliances you source yourself, and any landscaping or driveway work around the unit.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sunny Isles Beach Specifically Does to This Job

Sunny Isles Beach is a narrow barrier-island city almost entirely rebuilt as high-rise condos and hotels since the 1990s, which means most of the housing stock here is 1950s-70s low-rise motels-turned-condos and 1990s-2000s towers along Collins Avenue and A1A. Single-family garages are relatively rare compared with inland Miami-Dade, so when a homeowner does have a garage to convert, it’s usually on one of the older low-rise properties, and that garage has often gone decades without a permit pull or an electrical update.

Direct Atlantic salt spray means every metal component in the build, from door frames to fasteners, needs corrosion-resistant specification. Summer humidity and heavy rain make waterproofing and stucco schedules a real fight with the weather, so exterior work gets sequenced around the storm season. And the building department here is one of Miami-Dade’s strictest, with the 40-year recertification program (now 30-year for older buildings) driving most rehab activity on Collins Avenue. That recertification culture means inspectors know exactly what to look for on an older slab and wall assembly, and they will flag shortcuts. We pull permits and pass inspections on every garage conversion ADU we build across Sunny Isles Beach, ZIP 33160 included.

Serving Sunny Isles Beach, FL – Our Local Coverage Area

We serve Sunny Isles Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions About Garage Conversion ADU in Sunny Isles Beach

A galley kitchen opened up to the dining room with a new peninsula

Get a Free Garage Conversion ADU Estimate in Sunny Isles Beach

If you’re weighing a garage conversion ADU in Sunny Isles Beach, the next step is a free on-site estimate. We’ll walk the garage, check the slab, panel, and existing plumbing, and give you a written line-item quote with the real range for your property. Call (844) 797-4868 and a live person will set the visit. Projects over $10,000 get $1,000 off, and 0% financing for 18 months is available.

Written by the team at Groundwork Construction Co.

Why Sunny Isles Beach Chooses Groundwork Construction Co. of North Miami Beach

We set the standard for garage conversion ADU in Sunny Isles Beach.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunny Isles Beach

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunny Isles Beach Customers Say

Trusted by homeowners across Sunny Isles Beach and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A walk-in shower with large-format tile and a built-in nicheNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

More services in Sunny Isles Beach

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Miami Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Miami Beach team

A local vetted partner works across North Miami Beach and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Sunny Isles Beach?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunny Isles Beach.

(844) 797-4868

Request a Free Estimate in Sunny Isles Beach

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch