A Groundwork company - serving North Miami Beach, FL
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · North Miami Beach, FL

Garage Conversion ADU in North Miami Beach - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Miami Beach
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in North Miami Beach: What It Takes and What It Costs

A garage conversion ADU in North Miami Beach typically runs $35,400 to $94,400 and takes 10 to 16 weeks from permits to final inspection. You’re turning an existing attached garage into a self-contained living unit – bedroom, bathroom, kitchenette, separate entrance – inside a footprint the house already has. That’s why it costs a fraction of a detached build, and why the work is mostly about what’s hidden behind the drywall. Call (844) 797-4868 for a free on-site estimate.

Call (844) 797-4868

How We Run a Garage Conversion ADU, Stage by Stage

A finished backyard cottage with a small covered porch

Every garage conversion follows the same broad sequence. The differences come from what’s already there: a slab that was poured for cars, a garage door opening that has to become a wall, and utility runs that were never planned for someone to live on the other side of them.

Stage 1: Assessment and design, weeks 1 – 2

We start by measuring the slab, checking the ceiling height, and tracing where the electrical panel, water heater, and laundry connections sit. In North Miami Beach, we also check the flood zone and lot coverage early, because a 1950s ranch off NE 163rd Street may already be at or near its non-conforming coverage limit. You’ll decide the layout here: how many rooms, whether the entry faces the side yard or the alley, and where the kitchenette lands.

Stage 2: Permits and engineering, weeks 3 – 6

This is where a North Miami Beach garage conversion ADU lives or dies. Miami-Dade County’s High Velocity Hurricane Zone rules mean the new wall closing off the old garage door opening has to meet wind-borne debris standards, and the windows and doors you choose need the right product approvals. The building department review is thorough. We pull the permits and carry the plan through review – you don’t chase the inspector.

Stage 3: Demo and structural, weeks 7 – 8

Out comes the garage door, the tracks, the opener, and usually a section of the driveway apron that blocks the new entry. We frame the opening closed, add the new exterior door, and check the slab for cracks or settling that would telegraph through flooring later. If the existing garage shares a wall with the house, we confirm the fire separation required between a garage and a dwelling unit and bring it up to current code.

Stage 4: Systems rough-in, weeks 8 – 11

This is the longest interior stretch. The garage had a light and maybe an outlet; now it needs a subpanel or dedicated circuits, a bathroom drain line tied into the house, a water heater, a mini-split or ducted HVAC, and ventilation for the kitchenette. We coordinate the plumbing, electrical, and mechanical rough-ins with the county inspections in sequence, not all at once. You’ll approve fixture and finish selections during this window.

Stage 5: Finishes and final inspection, weeks 12 – 16

Insulation, drywall, flooring, tile, trim, and paint. Then the final inspections, and a walkthrough where we hand over the completed unit against the written scope. Anything that doesn’t match, we correct before we call it done – that’s what the 730-Day Done Right Promise backs up.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between

Most of the decisions that move the schedule and the budget land in these categories:

  • Slab vs. raised floor: The original garage slab is usually fine to build on, but it sits low. A moisture barrier plus a sleeper floor costs more upfront and handles North Miami Beach’s high water table better than tile straight onto concrete, which can telegraph damp. Tile on slab is the budget choice; a raised subfloor suits a unit that will see year-round humidity.
  • Mini-split vs. ducted HVAC: A ductless mini-split is simpler to install in a converted garage, keeps its own thermostat, and doesn’t rob airflow from the main house. Ducted systems give a cleaner look but need ceiling space and a return run.
  • Wet-wall placement: Keeping the bathroom against the wall that already has plumbing on the house side saves the most money. Moving it to the far corner for a nicer layout can add the cost of trenching the slab and re-routing drains.
  • Kitchenette grade: A compact base-cabinet run with a two-burner cooktop and under-counter fridge is the practical line. Full-size appliances and stone counters push into renovation territory and usually only make sense if the unit is for long-term family use.
  • Exterior cladding and door: Matching the existing stucco keeps the house looking whole from the street. A new impact-rated entry door and windows are a permit requirement here, not an upgrade – factor them in from the start.

We work with established product lines across these trades, so you’re choosing between real, spec’d materials rather than whatever happens to be available that week.

What a Garage Conversion ADU Costs in North Miami Beach, FL

A framer checking new wall framing on a home addition

The lead range for a garage conversion ADU in North Miami Beach is $35,400 to $94,400. Where you land inside it depends on the variables below.

Variable Pushes cost down Pushes cost up
Size of the garage Single-car, ~250 sq ft Double-car, ~450+ sq ft
Bathroom location Against existing house plumbing New slab trenching and re-route
Kitchenette scope Compact cooktop + under-counter fridge Full appliance package, stone counters
HVAC Ductless mini-split Ducted system with new returns
Permit scope Straightforward plan, existing structure Structural repair, coverage variance, engineering

A written estimate from us breaks these out line by line, so you can see exactly what drives your number. What’s included: permit pull and inspection coordination, demolition, structural closing of the garage opening, all rough-ins, finishes, and the final walkthrough. What usually isn’t: specialty appliances you source yourself, landscaping to restore the driveway apron, and any structural repair discovered after demo that couldn’t be seen on the original inspection. Upfront pricing means the number you see is the number you pay – no change-order surprises once the walls are open.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What North Miami Beach Homes Specifically Do to This Job

North Miami Beach sits directly on the Biscayne Aquifer and inside Miami-Dade County’s High Velocity Hurricane Zone, which matters more for a garage conversion than for most work. Wind-load and flood-proofing rules apply to the new wall and openings you’re adding, and the high water table means any slab work or drain trenching needs real forethought – we’ve seen a slab pour go sideways in a July downpour when drainage wasn’t planned for.

The housing stock we work in most is 1950s – 1970s single-story concrete-block and stucco ranches, many still carrying original galvanized plumbing and flat or low-slope roofs. In those homes, a garage conversion ADU almost always means opening a wall to discover the plumbing behind it is at the end of its life, or that the lot is already at its non-conforming coverage limit. We check both before we estimate, not after.

Coastal salt air on the east side of town drives material choices too – impact-rated hardware and marine-grade fasteners hold up far better than standard. And the June – November storm season shapes the schedule: exterior work gets front-loaded so the building is closed in before a system rolls through.

Serving North Miami Beach, FL – Our Local Coverage Area

We serve North Miami Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in North Miami Beach

New double-hung windows in a dining room

Get a Free Estimate for Your Garage Conversion ADU

If you’re ready to price a garage conversion ADU in North Miami Beach, call (844) 797-4868 to schedule a free on-site estimate. We’ll walk the garage with you, check the slab and utility runs, talk through layout and coverage limits, and follow up with a line-item written quote. No pressure and no vague ranges – a real number you can plan around.

Written by the team at Groundwork Construction Co.

Why North Miami Beach Chooses Groundwork Construction Co. of North Miami Beach

We set the standard for garage conversion ADU in North Miami Beach.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in North Miami Beach

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Miami Beach Customers Say

Trusted by homeowners across North Miami Beach and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodel

More services in North Miami Beach

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Miami Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Miami Beach team

A local vetted partner works across North Miami Beach and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in North Miami Beach?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in North Miami Beach.

(844) 797-4868

Request a Free Estimate in North Miami Beach

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch