Garage Conversion ADU in North Miami, FL: What It Involves and What It Costs
A Garage Conversion ADU in North Miami turns an existing attached garage into a self-contained living unit, and in this city that runs $35,400 to $94,400, with most of our converted garages landing in the middle of that band. Plan on 4 to 7 months from the first site visit to a signed-off final inspection, because Miami-Dade County permitting on older concrete-block housing sets the pace more than the framing does. Call (844) 797-4868 to schedule a free on-site estimate and a written, line-item scope before you commit to anything.
How a garage conversion actually runs, stage by stage

The sequence for a garage conversion is not the same as a ground-up build, because you’re working with a shell that already exists and a slab that may or may not want to be your finished floor. Here’s the real order.
Stage 1: Feasibility and survey (1 to 2 weeks). We measure the garage, check the slab for slope and cracking, map where the water heater, electrical panel and any gas lines run, and confirm the setback from your lot line. This is where you decide the unit’s footprint and whether it’s a studio or a one-bedroom. On a 1940s-to-1970s North Miami block house, the answer often hinges on whether the existing electrical service can carry a second kitchen and a mini-split, or whether a service upgrade is part of the job.
Stage 2: Design and permitting (6 to 12 weeks). Drawings go to Miami-Dade County for building, electrical, plumbing and mechanical review. Because the county enforces product approval on windows, doors and roof attachments, every product in the plan needs a current approval number before submittal – one missing approval sends the package back and the clock restarts. You decide finish grades here, since the drawings lock in fixture locations and window sizes.
Stage 3: Demo and rough-in (2 to 3 weeks). The garage door comes out and gets framed and finished as a wall; the slab gets evaluated for a moisture barrier and finish floor; plumbing and electrical get run to the new kitchenette and bath. If we’re moving a drain or adding a bathroom where there wasn’t one, this is the week that changes.
Stage 4: Insulation, drywall, finishes (4 to 6 weeks). Mold-resistant assemblies, impact-rated glazing, cabinet and counter install, flooring, paint, trim, and the mini-split or ducted system. This is the longest stretch and the one homeowners notice most.
Stage 5: Inspections and punch list (2 to 4 weeks). Rough-in inspections happen before drywall; final inspections happen after. On an older CBS house, one missed or failed inspection can stall the whole permit, which is why we schedule inspections as a milestone, not an afterthought.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between
Most of the decisions on a garage conversion fall into a handful of forks. Here’s what we walk through with you and the honest trade-off on each.
- Bathroom or no bathroom. A half-bath keeps plumbing close to existing stacks and stays on the low end; a full bath with a shower adds cost and usually means relocating or extending a drain line. If you’re renting the unit, a full bath is the difference between a studio and a real one-bedroom.
- Kitchenette vs. full kitchen. A sink, under-counter fridge and microwave drawer runs far less than a range, hood and full cabinet run. Many North Miami conversions use a compact kitchenette because the garage shares a wall with the main house and a second full kitchen complicates the permit scope.
- Mini-split vs. ducted. A ductless mini-split is the usual pick for a single converted garage – lower cost, no duct chase through the existing ceiling. Ducted makes sense if you’re tying into the house system or converting a larger footprint with multiple rooms.
- Flooring. Garage slabs are often sloped toward the door and can carry moisture. We evaluate the slab and, if needed, add a vapor barrier before any finish floor. Luxury vinyl plank and tile handle humidity and clean-up better than hardwood in a South Florida conversion.
- Windows and the old garage opening. Impact-rated glazing is standard here, and framing the former garage door opening into a wall is the single biggest visual improvement. Some homeowners keep a portion as a slider or French door to bring in light – a decision to make before drawings go out.
- Exterior finish. Stucco repair and matching paint over the patched opening is the common approach; a Sakrete-based patch and stucco blend keeps the wall consistent with the rest of the CBS house.
What a Garage Conversion ADU costs in North Miami, FL

For North Miami, the range is $35,400 to $94,400, and where you land depends on five things more than anything else.
- Footprint and layout. A single-room studio conversion sits near the low end; a one-bedroom with a full bath and kitchenette pushes toward the middle and up.
- Existing condition. A garage with a sound slab, intact stucco and adequate electrical service keeps cost down. A cracked, sloped or damp slab, or a panel that needs upgrading, adds thousands.
- Relocating plumbing or electrical. Adding a bathroom where none existed and extending a drain line is the biggest single swing variable. Keeping the new bath on the same wall as the house plumbing is how you keep it down.
- Material grade. Stock cabinets and a compact kitchenette vs. a fuller kitchen with quality cabinetry; vinyl plank vs. tile; standard vs. premium fixtures. A slight finish bump is a smaller line than most homeowners expect – the plumbing and electrical scope usually dominates.
- Permit scope. Window and door product approvals, roof attachment detailing, and whether the county requires any structural work on the old garage door header all affect the permit package and timeline.
Every estimate we write is line-item: demo, framing, rough-in, insulation, finishes, permit fees and inspection scheduling, with the number you see being the number you pay. What’s typically outside the scope and quoted separately if needed: a new electrical service upgrade, roof work on the house, and any exterior hardscape. This job is part of a full Home Additions & ADU in North Miami program, and we scope it the same way – written, itemized, no change orders slipped in later.
See the difference
Before
After
Before
After
Before
AfterWhat North Miami homes specifically do to this job
North Miami is a built-out, majority-renter inner suburb, and almost every garage conversion here is a renovation inside an older shell rather than new construction. The housing stock is overwhelmingly concrete-block and CBS, much of it 1940s to 1970s, often with a flat roof and an attached carport. That reality shapes the job in specific ways: Miami-Dade County enforces product approval on windows, doors, and roof attachments, and post-Andrew wind-mitigation detailing is not optional. One missed inspection on an older CBS house can stall the entire permit, so we treat the inspection schedule as a milestone and build product approvals into the submittal from day one. We also see salt air and South Florida humidity working on fasteners and rebar long before inland houses show the same wear, which is why we spec galvanized or stainless hardware and mold-resistant assemblies in every conversion. We work North Miami and the surrounding blocks in 33161, from homes near the Biscayne Boulevard corridor to the quieter streets toward Miami Shores and Golden Glades. Homeowners often pair this with Concrete Driveways & Concrete Work in North Miami when the old driveway is the only paved parking left after the garage comes off the parking count – a detail worth planning before demo day.
Serving North Miami, FL – Our Local Coverage Area
We serve North Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Garage Conversion ADU in North Miami

A garage conversion typically takes 4 to 7 months from first site visit to final inspection, with permitting on Miami-Dade County taking the longest single stretch. Framing and rough-in run 2 to 3 weeks, finishes 4 to 6 weeks, and inspections 2 to 4 weeks at the end. Call (844) 797-4868 for a written timeline tied to your specific garage.
Yes – a garage conversion requires a building permit and separate electrical, plumbing and mechanical permits through Miami-Dade County, and skipping them is not something we do. The county also requires product approval on windows and doors, so the permit package includes those documents up front. We pull the permits and walk the inspections; tell us your address and we’ll lay out the actual submittal path.
Often yes, if the new bathroom lines up with existing plumbing and the garage shell is sound. Keeping the bath on the shared wall with the house plumbing is the biggest cost saver we can offer. If there’s no existing drain line, the rough-in scope grows and so does the number on the estimate – something we confirm at the first site visit, not after demo.
Expect $35,400 to $94,400 for a garage conversion in North Miami, with a studio at the low end and a one-bedroom with a full bath and kitchenette toward the top. Finish grade, plumbing relocation, slab condition and permit scope move the number more than square footage. Call (844) 797-4868 for an exact quote – estimates are free and always line-item.
Every garage conversion we build is covered by the 730-Day Done Right Promise – if it’s not done right, we make it right, for two full years. That’s one of the longest workmanship guarantees in residential construction, and it’s in writing, not in fine print. Ask about it on the estimate call.
Get a written estimate for your North Miami garage conversion
Call (844) 797-4868 and we’ll set up a free on-site estimate for your Garage Conversion ADU in North Miami. On the call we ask about the garage’s size and slab condition, whether you want a bath or kitchenette, and your target timeline – then we walk the space, talk through the permit path, and put a line-item scope and price in your hands. No pressure, no upfront charge, just a real number you can plan around. It’s part of our broader Home Additions & ADU work, and homeowners we help often pair a conversion with Asphalt Driveways & Resurfacing in North Miami to restore parking once the garage is living space.