A Groundwork company - serving North Miami Beach, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Golden Glades, FL

New Detached ADU in Golden Glades - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Miami Beach
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Golden Glades, FL: What It Takes and What It Costs

A new detached ADU in Golden Glades typically runs $45,000 – $130,000 depending on size, site work, and finish level, and most builds take 4 – 7 months from permit to final inspection. Detached means a separate structure on your lot with its own foundation, roof, and utility connections, not a carve-out inside the main house. Because almost every Golden Glades parcel sits in a FEMA flood zone and falls under Miami-Dade’s post-Andrew wind code, the foundation and roof decisions come first and cost more here than they would inland. Call (844) 797-4868 for a free on-site estimate.

Call (844) 797-4868

How we build a detached ADU, stage by stage

A single-story rear room addition with tall windows and a new patio

Every new detached ADU follows the same five stages. What changes is how long each one takes, and that depends on your lot, your setbacks, and how fast the county moves through plan review.

Stage 1: Site evaluation and survey (week 1 – 2)

We walk the lot, confirm where the buildable envelope sits under setback rules, and check the flood zone designation on your parcel. You’ll need to decide the footprint and how the ADU will be oriented: door facing the alley, the driveway, or the main house. Survey and elevation work happens here, and this is the stage where a high water table on a low-lying lot gets flagged before it becomes a foundation problem.

Stage 2: Design and permit submission (week 2 – 10)

Plans get drawn to Miami-Dade wind-load standards, then submitted for building, zoning, and floodplain review. This is usually the slowest stretch, and it’s the one homeowners underestimate. You decide the floor plan, the exterior finish, and whether you’re tying into the existing sewer lateral or staying on septic. Approvals for sewer tie-ins can run on their own track with the county, so plan the calendar around them, not against them.

Stage 3: Site prep and foundation (week 10 – 14)

Clearing, grading, and utility trenching come first. Then the foundation: most ADUs here get a stem-wall or slab-on-grade system engineered for the flood zone, with the finished floor elevated to the required height. You’ll make the call on whether the slab gets a vapor barrier upgrade, which matters on flat terrain with a high water table. Inspections happen at excavation, forms, and pre-pour.

Stage 4: Framing, roof, and enclosure (week 14 – 22)

Walls go up, then the roof structure and sheathing. This is where the wind rating lives: roof-to-wall connections get strapped and nailed to the engineer’s schedule, and the door and window openings get framed for impact-rated units. You’ll pick the door style and glass package in this window. The building gets dried in before interior work starts, which keeps summer thunderstorms from stalling the schedule.

Stage 5: Finishes, systems, and final inspection (week 22 – 30)

Electrical, plumbing, and HVAC rough-in get inspected, then insulation, drywall, flooring, cabinets, and fixtures. You decide countertops, floor material, and appliance package. Final building, electrical, and plumbing inspections close the permit. A detached ADU in Golden Glades often runs a month longer than the same structure inland because of floodplain review and the extra elevation documentation.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that actually shape your ADU

Most of the budget question comes down to five decisions you’ll make before framing starts. Here’s the honest trade-off on each.

  • Stick-built versus panelized or modular. Site-built gives you total control over layout and fits odd lot shapes. Panelized systems from a supplier like Dvele or Cover compress the framing stage and reduce weather exposure during hurricane season, but they lock the floor plan earlier. Modular can shave weeks but adds transport logistics and crane day.
  • Impact glass versus shutters. Impact-rated windows and doors cost more upfront but eliminate the storm-prep scramble and satisfy wind-borne debris requirements in one step. Accordion or panel shutters cost less and still pass, but you’re installing them every named storm.
  • Roof assembly. Standing-seam metal lasts longest and handles low-pitch sections well. Architectural shingle costs less and still meets wind rating when installed to spec. Flat or low-slope sections need a membrane system, and those cost more per square.
  • Flooring. Luxury vinyl plank is the practical pick on a slab in a flood zone, since it survives a minor water event better than laminate. Porcelain tile lasts decades. Engineered hardwood looks best and costs the most.
  • Utility connection. Tying into existing water and sewer is cheapest when the lateral is in good shape. A long trench run, a new meter, or a septic-to-sewer tie-in coordinated with the county pushes this line item up substantially.

What a New Detached ADU costs in Golden Glades, FL

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for a detached ADU here. A compact studio with basic finishes sits near the bottom. A two-bedroom unit with impact glass, metal roof, and upgraded kitchen lands at the top. Five variables move that number:

  1. Size and footprint. Square footage drives every trade, and a larger footprint can trigger more site work and grading.
  2. Foundation requirements. Flood-zone elevation, a high water table, and any fill or grading push foundation cost up.
  3. Utility distance and condition. Long trench runs, a new meter, or a sewer tie-in add real dollars.
  4. Finish grade. Cabinets, countertops, flooring, and fixtures can swing the total by tens of thousands.
  5. Permit scope. Impact glass, floodplain review, and any variance add review time and fees.

A written estimate itemizes foundation, framing, roof, windows and doors, MEP rough-in, finishes, permits, and site work separately, so you see each line. What it typically doesn’t include: furniture, landscaping beyond rough grading, and any utility upgrade the county requires after inspection. Pricing is upfront, the number you see is the number you pay, and 0% financing for 18 months is available with $1,000 off projects over $10,000.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Golden Glades homes specifically do to this job

Golden Glades is one of the last low-density, single-family pockets in Northeast Miami-Dade where a large lot still leaves room for a true detached structure, and that’s exactly why ADU interest runs high here. It’s also why the wrong contractor gets in trouble. Nearly every parcel sits in a FEMA flood zone and falls under the county’s post-Andrew wind code, so foundation elevation and roof-to-wall connections aren’t optional upgrades. The typical property is a 1950s – 1970s concrete-block ranch with a carport and a flat or low-pitch roof on a generous lot, which suits a detached build well. But the ground is flat and low, sitting just west of the Biscayne Aquifer recharge zone, so the water table is high and summer storms are intense; drainage and vapor control get planned before the slab goes down, not after. And on canal-side and low-lying lots, a septic-to-sewer tie-in often runs alongside the ADU permit, which means coordinating with county environmental and water-management review before ground breaks. Plenty of homeowners pair the build with Concrete Driveways & Concrete Work in Golden Glades or Paver Driveways in Golden Glades so the new unit has its own access. When the ADU is part of a bigger plan, we handle it as part of a full Home Additions & ADU in Golden Glades scope, and you can see the full range of what we build on our Home Additions & ADU service page. We cover the whole Golden Glades area, including nearby Ives Estates, Ojus, and North Miami.

Serving Golden Glades, FL – Our Local Coverage Area

We serve Golden Glades and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Golden Glades

New architectural shingles with a clean valley

Get a free estimate for your detached ADU

Call (844) 797-4868 to set up a free on-site estimate for your new detached ADU in Golden Glades. We’ll walk the lot, check your flood zone and setbacks, and talk through footprint, finish level, and what the build will realistically cost. You’ll get a written line-item quote with upfront pricing, no surprises, and a free design consult. Live person answers, 24/7.

Written by the team at Groundwork Construction Co.

Why Golden Glades Chooses Groundwork Construction Co. of North Miami Beach

We set the standard for new detached ADU in Golden Glades.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Golden Glades

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Golden Glades Customers Say

Trusted by homeowners across Golden Glades and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Golden Glades

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Miami Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Miami Beach team

A local vetted partner works across North Miami Beach and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Golden Glades?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Golden Glades.

(844) 797-4868

Request a Free Estimate in Golden Glades

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch