New Detached ADU in Ojus, FL: What It Takes and What It Costs
A new detached ADU in Ojus is a fully separate, self-contained home built on your lot – bedroom, full bath, kitchen, its own utilities – and it runs $45,000 – $130,000 for the scope most Ojus owners are building, with the far end of that range tied to size, finish grade and how much utility work the site demands. Plan on 6 – 9 months from contract signing to final inspection. Call (844) 797-4868 to schedule a free on-site estimate, and we’ll give you a written, line-item number before you commit to anything.
The single thing that most sets an Ojus detached ADU apart from one built down the street in Ojus or in a city like Aventura is jurisdiction. Where your lot sits relative to the Miami-Dade and Broward county line decides which building department reviews your plans, which product approvals your doors and roof have to carry, and how long the review clock runs.
How the Build Actually Runs, Stage by Stage

Most ADU quotes are vague because the process is vague in the quote. Here’s how a detached unit actually goes up, with the time each stage takes and the decisions you’ll be making while it’s in front of you.
Days 1 – 3: Site survey and boundary verification
We start by confirming your setbacks, your easements, and where the unit can legally sit. In Ojus, this often means checking whether your lot fronts a road that puts you under Miami-Dade’s review or Broward’s, because the answer changes the setback math and the product approval list. You’ll be deciding placement on the lot and confirming whether existing trees, fences or drives need to move. Expect 15 – 20 hours of survey and plot work before anyone drives a stake.
Weeks 1 – 6: Design and permit submittal
Drafting, engineering and permit submittal. You’ll pick the footprint, ceiling height, door and window specifications, and whether the unit is one bedroom or a studio before we file. Since roofs, doors and windows in this part of South Florida fall under the high-velocity hurricane zone rules, every opening on the building has to carry an approved product rating – we walk you through the approved list rather than guessing. Review time depends heavily on which county’s department you’re in.
Weeks 6 – 10: Foundation, utility trenching, rough-in
Slab, stem wall and utility trenches. Water, sewer or septic, and electrical conduit get run from the main house to the future unit. You’ll decide whether to meter the ADU separately or tie it to your existing service, and whether to run a gas line for cooking or hot water. If your home is a 1950s – 70s Ojus ranch, the connection point at the main house is usually where the surprise line items hide – old undersized service panels are common and need addressing before the unit can be energized.
Weeks 10 – 22: Framing, envelope, roofing
Framing, sheathing, weather barrier, roof and exterior finishes. This is the stage where your material choices translate into dollars and into storm performance. You’ll be choosing roof type, roof decking grade, door and window systems, and siding or stucco. We use rated systems throughout – IKO and Atlas shingle lines and rated impact assemblies are on the table – and we won’t put on an unrated door, no matter what it saves, because it fails inspection and it fails you in a storm.
Weeks 22 – 34: Rough-in inspection, insulation, drywall, finishes, final walk
Once framing and rough-in pass inspection, drywall and finishes follow. Kitchen and bath selections, flooring, trim and paint. Final inspections come last, and we don’t hand over keys until everything passes and you’ve walked the unit with us.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Choices You’ll Be Making: What Holds Up and What It Costs
Every ADU involves real trade-offs. Here’s what we see Ojus owners actually weigh, and the honest math behind each.
- Foundation type. A monolithic slab is the simplest and cheapest path on a flat Ojus lot. A stem-wall or raised floor adds cost but makes more sense if your grade sits low and you’re worried about standing water during storm season.
- Roof system. Shingle over a rated underlayment is the workhorse choice and the best value at the $45,000 – $130,000 range. A metal or tile roof costs meaningfully more but lines up better with an older ranch’s existing look and handles the sun load well.
- Doors and windows. All openings need approved impact-rated assemblies here. You’ll choose between impact glazing or rated shutters over standard windows – impact glazing costs more up front, shutters cost less but you have to deploy them.
- Stucco vs. siding. Stucco matches the Ojus block-and-stucco ranch look and handles humidity well when detailed correctly. James Hardie fiber cement siding costs less on labor but changes the visual character of the unit.
- Finishes. A studio or one-bedroom guest unit with builder-grade kitchen and bath sits near the bottom of the range. A full two-bedroom unit with a separate kitchen, custom cabinetry and upgraded tile pushes straight toward the top.
Homeowners often pair this with Concrete Driveways & Concrete Work in Ojus so the ADU gets its own parking pad, or with Paver Driveways in Ojus if the existing drive needs to be rerouted around the new footprint.
What a New Detached ADU Costs in Ojus, FL

Expect $45,000 – $130,000 for a detached ADU in Ojus. The range is wide because five variables drive it, and each of them can swing the final number by thousands.
- Size and bedroom count. A studio or one-bedroom unit sits at the low end. Every additional bedroom, closet and bath pushes the number up – a 400 sq ft studio and an 800 sq ft two-bedroom are two different projects with two different prices.
- Site conditions. Sloping grade, old trees, a short setback, or an existing septic system all require rework. Our technicians have up to 12 years of experience with South Florida lot conditions and will flag these at the estimate stage, not mid-build.
- Utility run distances. If the ADU is 80 feet from the main panel versus 20 feet, the electrical and plumbing costs move significantly. Older ranches with thin service panels almost always need an upgrade.
- Finish grade. Builder-grade kitchen and bath finishes stay inside the range. Upgraded cabinetry (KraftMaid, for example), stone counters, custom tile work in the shower, or a feature wall push toward the high end.
- Permit and jurisdiction scope. The county-line reality in Ojus is that permit review can require different product approvals from the same plans – one side of the street versus the other. That adds review time and, occasionally, re-spec work.
Our written estimate is line-itemed, with the scope spelled out, the products listed by brand and model, and the permit work included. No hassle, no surprise numbers halfway through. What it doesn’t cover by default: furniture, appliances outside the stated scope, landscaping restoration, or utility connection fees charged by the city or county. We list those separately so you’re not guessing.
See the difference
Before
After
Before
After
Before
AfterWhat Ojus Lots Add to This Job
Ojus isn’t a single-code city, and that’s the fact that shapes everything. The unincorporated pocket along the US-1/Biscayne corridor straddles the Miami-Dade and Broward line, so permit review might land with one county or the other depending on which block your lot sits on. We’ve done the paperwork for both. That means we start by confirming which building department has jurisdiction before we draft a single page – because an incorrectly filed permit is time lost, and the product approval list is not identical between the two.
The other reality here is the housing stock. The 1950s – 70s single-family ranches on modest lots in Ojus are where ADU projects live, and those homes come with old service panels, clay-tile or low-slope roofs, and sometimes buried septic. Re-fastening an existing roof to current uplift schedules isn’t optional when you’re adding a second dwelling to the lot, because the county reviews the whole property’s storm performance. We size the utility tie-in around what’s actually there, not what the old drawings claim.
The heat and humidity that come with the afternoon storms year-round also shape the build. Every wall and roof assembly we detail has to handle moisture correctly, or you’re looking at mold in the stucco inside of two years. That’s a chapter of the plan you don’t want to cut.
Serving Ojus, FL – Our Local Coverage Area
We serve Ojus and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: New Detached ADU in Ojus

Plan on 6 – 9 months from signed contract to keys. Permit review is the variable that breaks the schedule, because the Ojus county line means your review timeline depends on which department has jurisdiction over your lot. Call (844) 797-4868 for a realistic timeline based on your specific property.
Yes, and you need it from the correct county. Because Ojus straddles Miami-Dade and Broward, the building department that reviews your plans is determined by your lot’s location, not by preference. A detached ADU can’t be built without a valid permit – and the product approvals on your doors, windows and roof must match the jurisdiction. Call (844) 797-4868 to schedule your free estimate.
Usually yes, but it depends on the service capacity at the main house. If your Ojus home has an older, undersized service panel or limited water pressure, those systems will likely need upgrades to support the new unit. Our technicians will check both before quoting, and the written estimate reflects what’s actually there.
Between $45,000 and $130,000, depending on size, finish grade, site conditions and utility runs. A studio or one-bedroom guest unit sits at the low end; a two-bedroom with upgraded finishes and a longer utility run pushes toward the high end. Call (844) 797-4868 for an exact quote – estimates are free and line-itemed.
Our 730-Day Done Right Promise covers the workmanship on your new detached ADU, and if anything wasn’t done right, we make it right. That guarantee is one of the longest workmanship warranties in the residential construction space. Call (844) 797-4868 to schedule your free estimate and we’ll walk you through the full scope.
Get a Free Estimate on Your Ojus Detached ADU
If you’ve got a buildable lot and you’re ready to talk real numbers, call (844) 797-4868. We’ll come out to your Ojus property, confirm the setback and jurisdiction, and give you a written line-item estimate at no cost. Live person on the phone 24/7, upfront pricing, and no changes once the work starts. Home Additions & ADU in Ojus gives you the full picture of scope, and you can also look at Home Additions & ADU for how we handle the wider project.