Cabinets & Countertops in Miami Beach, FL: What the Job Really Takes
Cabinets & countertops in Miami Beach, FL typically run $16,520 to $53,100 for a full kitchen’s worth of new cabinetry and stone surfaces, start to finish. Most jobs take three to five weeks from demo to final caulk, and the countertop template happens only after the base cabinets are set and level. Call (844) 797-4868 to schedule a free on-site estimate with a written, line-item quote.
The five stages of a cabinets and countertop job, in order

Cabinet and countertop work looks simple from the outside. In practice it’s a sequencing job, and the order matters more than the materials. Here’s how we run it in Miami Beach.
Stage 1 – Measure and order (week one). We take field measurements, confirm appliance sizes, and lock the layout. You sign off on door style, finish, and box construction, and cabinet lead times get confirmed in writing. Boxes and doors can run two to six weeks depending on the brand line. This is the stage where decisions get expensive to change later, so we push you to settle the finish and hardware now.
Stage 2 – Demo and wall prep (day 1 to 3). Old cabinets and counters come out, the walls get opened where needed, and we check what’s behind: furring strips, old stucco, corroded fasteners, or a lintel that’s no longer doing its job. In Miami Beach’s masonry stock this is where surprises surface, and we price any repair before we proceed, not after.
Stage 3 – Set base cabinets and rough-in (day 3 to 6). Base boxes go in first, shimmed and shimmed again until dead level. That’s the whole reason countertops fit cleanly. Any electrical for outlets under the uppers or plumbing for the sink gets roughed in here. If you’re relocating the sink or moving the range, this is when it happens, and it’s the single biggest cost variable on the job.
Stage 4 – Template the countertop (day 6 to 9). A fabricator templates the countertop after the bases are locked down. You commit to edge profile, slab, and sink cutout at this point. Stone fabrication then takes five to ten business days. This is the stretch where the job looks frozen. It isn’t; the slab is being cut.
Stage 5 – Set the top, finish the uppers (day 9 to 14). Countertops go in, then the upper cabinets, crown, filler panels, door fronts, and hardware. Sink, faucet, and appliance connections go last. We do a walkthrough with you, and the 730-Day Done Right Promise starts at that handoff.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
These are the real decisions, and the trade-offs are honest ones.
- Stock vs. semi-custom cabinets. Stock boxes go in fast and cheaper, but they come in fixed sizes, and old Miami Beach kitchens rarely hit standard dims. Semi-custom lets you hit the wall to the inch, which matters in a Mediterranean Revival where nothing is square. KraftMaid is our go-to here for the balance of price and fit.
- Quartz vs. natural stone. Quartz is non-porous, doesn’t need sealing, and handles humidity without staining. Cambria is the line we trust for it. Granite is harder, cheaper at the low end, but it wants sealing and reacts to acidic spills. In a beach condo with high humidity, quartz wins most often.
- Full-height vs. standard backsplash. This page covers the cabinet and counter package; the backsplash itself has its own page, but you’ll be picking a height here so the slab and cabinets line up. Full-height slab backsplash looks seamless and costs more.
- Plywood vs. particleboard boxes. Plywood wins against salt air and humidity. Particleboard swells when it gets wet. In 33139 we spec plywood by default.
- Marine-grade fasteners and sealants. Within a few blocks of the ocean, galvanized hardware fails years sooner than on the mainland. We spec stainless or hot-dipped fasteners and marine-grade sealant as a matter of course on this side of the bridge.
What Cabinets & Countertops costs in Miami Beach, FL

The realistic range for a full cabinet and countertop package is $16,520 to $53,100. Cabinet installation alone runs $4,720 to $15,340; countertop installation runs $2,360 to $7,670. Below the full-package figure, these line items show where the number moves.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,720 – $15,340 |
| Countertop installation | $2,360 – $7,670 |
| Backsplash installation | $945 – $2,950 |
| Kitchen island installation | $3,540 – $11,800 |
| Small kitchen remodel | $10,620 – $23,600 |
Five variables push a job from the low end to the high end. Size and layout drive the box count and the linear feet of stone. Existing condition drives wall repair; a 1950s Miami Beach kitchen with rusted furring strips and failing stucco can add real prep cost. Relocating plumbing or electrical moves you up fast, because it needs rough-in and inspection. Material grade separates a stock box and laminate from semi-custom and full slab. Permit scope matters most: moving a sink or adding circuits triggers a mechanical or electrical permit, and a like-for-like replacement of cabinets may not.
A written estimate from us itemizes each of these. What’s typically not included: appliance purchase, moving structural walls, and any hidden water damage found after demo. Those get priced in writing before we proceed, never after. Upfront pricing, no surprises.
See the difference
Before
After
Before
After
Before
AfterWhat Miami Beach homes specifically do to this job
Miami Beach construction is a different animal, and the cabinets and countertops trade feels it. Nearly every project north of the Art Deco core in 33140 sits on a barrier island where salt-laden wind corrodes fasteners, hinges, and drawer slides months sooner than on the mainland. Flood-plain rules and the city’s strict coastal building codes mean even a small remodel can pull in elevation certificates and wind-mitigation requirements. And 33139 sits inside a historic district, where exterior changes need design review, so a job that’s routine in Hialeah becomes a permitting and materials project here.
The housing stock does the rest. The 1920s-40s Mediterranean Revival and Art Deco masonry buildings in 33139 have concrete-block walls and stucco, decades of spalling, and cabinets that were fit to walls that weren’t square when they went up. South Beach through 33140 is mid-rise and high-rise condos from the 1950s-70s, with their own HOA rules on contractor hours, elevator use, and materials. The estates on the Venetian Islands, North Bay Road, and La Gorce have the opposite problem: large kitchens and stone packages that push toward the high end of the range. Our technicians have up to 12 years of experience working this stock. We’re licensed and insured and pull the permits on every job. If you’re working with an HOA in Miami Beach, get their rules to us at the estimate stage; it saves weeks later.
Serving Miami Beach, FL – Our Local Coverage Area
We serve Miami Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Miami Beach

Three to five weeks from demo to final caulk, with the biggest variable being cabinet and slab lead times. The on-site work is roughly two weeks; the rest is fabrication and shipping. Call (844) 797-4868 and we’ll give you a written schedule with your estimate.
Not always. A like-for-like cabinet swap with no plumbing, electrical, or structural change usually doesn’t require one. Moving a sink, adding circuits, or altering a wall does, and in 33139 a historic-district exterior change needs design review as well. We confirm the permit scope in writing before any work begins.
Yes, and most jobs are exactly that. Keeping the sink and range where they are avoids rough-in and inspection and puts you at the low end of the range. Moving them is possible and common, and it’s the biggest single cost swing on the job.
Expect $16,520 to $53,100 for a full cabinet and countertop package, with cabinet install at $4,720 – $15,340 and countertops at $2,360 – $7,670. Call (844) 797-4868 for an exact quote – the estimate is free.
The 730-Day Done Right Promise covers workmanship for two years; if it’s not done right, we make it right. That’s in writing and it starts at your walkthrough, not at the handoff of a signed contract.
Get a free cabinets and countertops estimate in Miami Beach
Call (844) 797-4868 and a live person answers, any hour. We’ll schedule a free on-site visit, measure the kitchen, and hand you a line-item written quote covering cabinets, countertops, and any prep the walls need. If this is part of a full Kitchen Remodeling in Miami Beach project, we scope it that way; otherwise we stay on the cabinets. Either way, you get a fixed price before we start.