Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in North Miami, FL: What the Job Actually Involves
Cabinets & countertops in North Miami usually run $16,520 – $53,100 for a full kitchen’s worth of both, and a straight swap of like-for-like boxes and slabs takes about two to three weeks start to finish. The wild card here is the house underneath: most of what we open up in 33161 is a 1940s – 1970s concrete-block home, and old walls, out-of-square corners and aging plumbing decide the schedule more than the material you pick. Call (844) 797-4868 and we’ll walk your kitchen and give you a real number.
How a Cabinet and Countertop Job Runs, Day by Day

Kitchen cabinet and countertop work is a sequencing problem. Get the order wrong and you’re re-cutting stone or re-drilling a slab because the sink rough-in moved an inch. Here’s how we run it.
Stage 1: Measure, template and lock the layout (days 1 – 3)
We measure every wall, check for square, and note where the existing plumbing and electrical sit behind the old cabinets. On a CBS house, that usually means probing the block wall to confirm what’s actually there before anything gets ordered. You pick door style, finish and box construction now, not later, because lead time drives the whole calendar. Countertop material and edge profile get chosen in this window too, and we confirm the sink and faucet model so the fabricator templates to the real fixture.
Stage 2: Demo and prep the room (1 – 2 days)
Old cabinets, counters and backsplash come out, and we protect the floor and adjacent rooms. This is where surprises show up. We’ve pulled base cabinets in North Miami and found galvanized supply lines with pinholes, or a wall that was never finished behind the old run. If something needs correction, you hear it before we go further, with a written number attached.
Stage 3: Rough-in corrections and wall work (1 – 3 days)
If we’re moving a sink, adding a dishwasher circuit, or relocating a range, the plumbing and electrical get done now and inspected if the scope triggers it. Block walls get furring and patching so the new boxes sit flat and plumb. Skipping this step is the number one reason new cabinets end up shimmed and gapped.
Stage 4: Cabinet set and countertop template (2 – 4 days plus fabrication)
Base and wall cabinets go in level and scribed to the wall. Then the countertop fabricator templates the actual installed boxes, and the stone gets cut off-site. That fabrication window runs roughly 5 – 10 business days for quartz or granite. You’re without counters during that stretch, so plan meals accordingly.
Stage 5: Counter install, sink set and punch list (1 – 2 days)
Slabs land, seams get set, the sink and faucet go in, and we check every door, drawer and hinge. You walk the room with us and sign off on a punch list. Whole job lands in that two-to-three-week band when nothing structural surfaces.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make, and What Each One Costs You
- Stock vs. semi-custom boxes. Stock cabinets keep you near the low end of the cabinet range ($4,720 – $15,340) but only fit standard sizes, so gaps get filled with filler strips. Semi-custom lets you hit the ceiling height and odd corners common in older North Miami homes, at more money. KraftMaid sits in that semi-custom tier and is what we steer most full-kitchen clients toward.
- Quartz vs. granite vs. laminate. Quartz is non-porous and holds up to South Florida humidity without sealing; Cambria is a solid quartz pick. Granite is natural stone, costs a bit less per square foot, but needs periodic sealing. Laminate is the budget answer and fine for a rental unit, which matters in a majority-renter suburb.
- Slab thickness and edge profile. A 2cm slab with a built-up edge looks the same as 3cm and saves money. Eased edges cost less than ogee or waterfall profiles, which add fabrication time.
- Drawer and door hardware. Soft-close slides and hinges are worth the upgrade. Cheap slides fail first in a humid kitchen.
- Under-cabinet lighting and outlets. Adding circuits means electrical work and possibly a permit line. Decide before cabinets go up, not after.
What Cabinets & Countertops Cost in North Miami, FL

Plan on $16,520 – $53,100 for cabinets and countertops together on a full kitchen. Cabinet installation alone runs $4,720 – $15,340; countertop installation runs $2,360 – $7,670. A kitchen island, if you’re adding one, is $3,540 – $11,800. Here’s what pushes a job to the low or high end.
- Room size and cabinet run length. A small galley lands near $16,520. A large kitchen with an island and full-height pantry cabinets lands near the top.
- Condition of what’s behind the old cabinets. Bad plumbing, no finished wall, or an out-of-square block wall adds correction days.
- Moving plumbing or electrical. Keeping the sink and range where they are saves real money. Relocating them adds rough-in, patching and possibly inspection.
- Material grade. Laminate and stock boxes vs. quartz and semi-custom is the single biggest swing.
- Permit scope. Like-for-like swaps may not need one. Layout changes with plumbing or electrical almost always do.
Your written estimate is line-itemed: cabinets, countertops, demo, rough-in corrections, install labor and permit fees if applicable. What’s typically not in it: appliance costs, structural repairs found during demo, and any change you make after the countertop template. We hold the price on the scope we quoted.
See the difference
Before
After
Before
After
Before
AfterWhat North Miami Homes Specifically Do to This Job
North Miami is a built-out, mostly-renter inner suburb, and the housing stock shows it: concrete-block homes from the 1940s through the 1970s, many small and flat-roofed, with older electrical and plumbing. That changes this job in specific ways. The block walls are rarely plumb, so new cabinets get scribed and shimmed rather than dropped in. Old galvanized lines behind the base cabinets are common, and we plan for the possibility of replacing a run once the old boxes come out. Miami-Dade product approvals and post-Andrew wind-mitigation detailing matter here even on interior work, because one missed inspection on an older CBS house can stall the whole permit. The goal on a lot of these kitchens is bringing an aging block house up to current code without triggering a full re-permit cycle, and that means knowing exactly what the city’s inspection schedule requires before we touch a wall. If the kitchen job is part of a wider scope, see our Kitchen Remodeling in North Miami page for the full-project view, or our Kitchen Remodeling service for how we handle the trade across the board.
Serving North Miami, FL – Our Local Coverage Area
We serve North Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in North Miami

Most jobs run two to three weeks from demo to punch list. The cabinet set itself is a few days; the countertop fabrication window of 5 – 10 business days is what stretches the calendar. Call (844) 797-4868 for a schedule tied to your actual room.
Like-for-like swaps often don’t require one, but any layout change that moves plumbing or electrical usually does, and Miami-Dade’s product-approval rules apply to what goes in. We tell you up front which side of that line your job falls on and pull the permit if it’s needed.
Yes, and that’s how most of our North Miami cabinet and countertop jobs run. Keeping the sink and range in place avoids rough-in work, patching and inspection delays, which keeps the price near the low end of the $16,520 – $53,100 range.
Expect $16,520 – $53,100 for cabinets and counters together, with cabinet installation alone at $4,720 – $15,340 and countertop installation at $2,360 – $7,670. Material grade, room size and how much correction the old walls need move that number. Call (844) 797-4868 for an exact quote; estimates are free.
Every cabinet and countertop job we do is backed by our 730-Day Done Right Promise: if it’s not done right, we make it right. That covers our workmanship for two years, well beyond the standard one-year contractor warranty.
Get a Free Estimate on Cabinets & Countertops in North Miami
We cover North Miami and the surrounding neighborhoods, and we’ll come measure your kitchen, confirm what’s behind the old cabinets, and hand you a line-itemed estimate at no cost. Call (844) 797-4868 and a live person answers, any hour. If your project grows into a bigger addition, homeowners often pair this with a Garage Conversion ADU in North Miami or a New Detached ADU in North Miami, and we can scope it all in one visit.
Written by the team at Groundwork Construction Co. of North Miami Beach.