A Groundwork company - serving North Miami Beach, FL
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Sunny Isles Beach, FL

New Detached ADU in Sunny Isles Beach - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Miami Beach
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Sunny Isles Beach, FL: What It Costs and How It Gets Built

A new detached ADU in Sunny Isles Beach generally runs $45,000 – $130,000, with most single-story units landing in the $90,000 – $220,000 range once you add a full kitchen, bath, and impact-rated envelope. Plan on 6 to 10 months from the first survey to the final inspection, because Miami-Dade review and coastal product approvals set the pace. Call (844) 797-4868 and we’ll walk your lot, confirm what’s buildable, and put a line-item number in your hands.

Call (844) 797-4868

How a Detached ADU Goes From Survey Stakes to Final Inspection

A garage converted into a guest room and home office

Detached means a standalone structure with its own foundation, its own utility trench, and its own set of inspections. That’s more moving parts than a garage conversion, and the sequence matters. Here’s how we run it.

Stage 1: Site survey and feasibility (week 1 – 2)

We start by pulling your lot survey and the zoning setback line, then confirm what footprint actually fits after setbacks and required open space. On a Sunny Isles Beach lot, that usually means a rear-yard or side-yard placement, and the answer often surprises people. You decide the rough size and whether you want one story or two at this stage, because that choice drives everything downstream.

Stage 2: Design and permit submission (weeks 3 – 12)

We finalize the floor plan, elevation, and a full product schedule with wind-load and impact ratings that Miami-Dade will accept. Then we submit for building permit and, if your property is in an association, the architectural review package at the same time. You sign off on the plan set and the finish schedule here. Approval timelines at the county run long, so we don’t wait to start ordering long-lead items.

Stage 3: Site prep, foundation, and utility trench (weeks 12 – 18)

Demo of any existing slab or landscape, excavation for footings, and the utility trench for water, sewer or septic tie-in, and electrical conduit. A typical detached unit is on grade with a monolithic or stem-wall foundation. You’ll want to decide now whether the unit gets its own electric meter or sub-panel off the main house, because that choice affects the trench and the permit scope.

Stage 4: Framing, envelope, and rough-ins (weeks 18 – 28)

Walls up, roof on, then the envelope sealed against water before anything inside gets finished. Rough plumbing, electrical, and HVAC go in and get inspected while the walls are open. This is the stage where salt air and summer rain become real construction problems, so we schedule waterproofing and stucco around the forecast, not around convenience.

Stage 5: Finishes, final inspections, and handover (weeks 28 – 40)

Insulation, drywall, cabinets, counters, flooring, fixtures, paint, and punch list. The final building inspection and certificate of occupancy come last. You’ll sign off on finishes at the start of this stage, and we walk the finished unit with you before we call it done.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make on a Detached ADU

These are the decisions that change both the look and the number, with the honest trade-off on each.

  • Structure type: stick-built vs. panelized/modular. Stick-built gives you full control over the plan and fits odd lot shapes. Panelized and modular systems from builders like Abodu or Dvele can shorten site time, but they lock you into a set of standard footprints and need a crane or truck access your lot may not have.
  • Foundation and slab. Standard reinforced slab is the common choice and the cheapest. If your lot drains poorly, an elevated stem-wall or raised floor costs more up front but keeps the unit out of standing water after a heavy rain.
  • Impact-rated windows and doors. Non-negotiable in this wind zone. Impact glazing from a manufacturer like Andersen adds cost but avoids shutters and passes wind-borne debris review cleanly.
  • Exterior finish. Stucco over masonry or fiber-cement siding from James Hardie. Stucco suits the Florida look and handles sun well; fiber-cement installs faster and resists moisture at seams better. Salt exposure means specifying corrosion-resistant fasteners either way.
  • Roof. Standing-seam metal runs longer in salt air than asphalt shingle. Standard shingle from GAF or CertainTeed is the budget option and still performs if the underlayment and flashing are done right.
  • Interior finish grade. Builder-grade cabinets and quartz counters keep you at the low end. Upgraded cabinetry, tile, and fixtures push you toward the top of the range.
  • Utilities. Separate meter vs. sub-panel, and whether the unit needs its own HVAC condenser pad and disconnect. These are quiet cost drivers most homeowners don’t see coming.

This is one piece of the wider project picture if you’re also weighing a larger addition. See our Home Additions & ADU in Sunny Isles Beach page for the full scope.

What a New Detached ADU Costs in Sunny Isles Beach, FL

A framer checking new wall framing on a home addition

The working range is $45,000 – $130,000, with full-featured detached units commonly landing in the $90,000 – $220,000 band once structure, utilities, and finishes are all in.

Line item Typical range
Design, engineering, permit package $4,000 – $12,000
Site prep, excavation, foundation $8,000 – $22,000
Framing and shell $18,000 – $45,000
Roofing and impact envelope $10,000 – $28,000
Plumbing, electrical, HVAC rough and finish $12,000 – $32,000
Interior finishes, kitchen, bath $14,000 – $40,000

What pushes you to the high end: footprint size, a two-story layout, relocating or upgrading the utility service, premium finishes, a difficult lot with limited access, and any added scope the county review requires.

What’s in a written estimate from us: the full line-item breakdown above, permit fees, and the product schedule with brands named. What’s typically not: landscape restoration after the trench, separate HOA review fees, and any change you request mid-build. Front-load the decisions and the number holds. Our pricing is upfront: the number you see is the number you pay, backed by the 730-Day Done Right Promise.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sunny Isles Beach Lots Specifically Do to This Job

Much of this city’s housing stock is 1950s – 70s low-rise motels-turned-condos and 1990s – 2000s towers along Collins Avenue and A1A, which means single-family lots suitable for a detached ADU are scarce and usually tight. Where they exist, setbacks and open-space rules cut the buildable footprint faster than homeowners expect, and alley or side access often decides whether a truck can even reach the rear yard. Permitting runs through one of Miami-Dade’s strictest building departments, so every product in the schedule needs its wind-load and impact documentation ready at submission. The ocean side is the real test: direct Atlantic salt spray eats fasteners, frames, and railings far faster than a few blocks inland, so we specify corrosion-resistant hardware and impact glazing from the first drawing. Summer humidity and heavy rain make waterproofing and stucco a constant scheduling battle. We cover the full city, ZIP 33160, and our Sunny Isles Beach service page lays out the rest.

Serving Sunny Isles Beach, FL – Our Local Coverage Area

We serve Sunny Isles Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: New Detached ADU in Sunny Isles Beach

New double-hung windows in a dining room

Get a Free Estimate on Your Detached ADU

Call (844) 797-4868 to schedule a free on-site estimate for your new detached ADU in Sunny Isles Beach. A live person answers 24/7, and on the visit we’ll confirm setbacks, walk the utility route, and hand you a written line-item quote with the product schedule. No-hassle upfront pricing, 0% financing for 18 months, and $1,000 off projects over $10,000.

Written by the team at Groundwork Construction Co.

Why Sunny Isles Beach Chooses Groundwork Construction Co. of North Miami Beach

We set the standard for new detached ADU in Sunny Isles Beach.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunny Isles Beach

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunny Isles Beach Customers Say

Trusted by homeowners across Sunny Isles Beach and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityA wood double vanity with two mirrors after a bathroom remodel

More services in Sunny Isles Beach

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in North Miami Beach

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your North Miami Beach team

A local vetted partner works across North Miami Beach and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Sunny Isles Beach?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunny Isles Beach.

(844) 797-4868

Request a Free Estimate in Sunny Isles Beach

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch